Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

2020 Architect and Engineering IDIQ
Post-Bid
$5,000 to $75,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

A-E Architectural Design Services at Various Installations
Post-Bid
Less than $99,000,000 est. value

Architect-Engineer Supplemental Services - Southeast Regional Office
Results

Engineering Services
Term Contract
Post-Bid

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Surveying and Mapping Consultant - District Wide
Post-Bid
Less than $1,500,000 est. value

Last Updated 04/21/2022 03:14 PM
Project Title

Bradenton Area Convention Center Expansion - Architecture / Engineering

Physical Address View project details and contacts
City, State (County) Palmetto, FL 34221   (Manatee County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, materials, equipment, supplies and travel to perform design and permitting services (to include civil, architectural, mechanical, electrical, and plumbing), bidding and construction phase services for the County. The services include project management, coordination, field review, data collection, including Subsurface Utility Engineering (SUE) and surveying, design and permitting for the construction of anew racquet and aquatic complex. Provide all labor and materials for the design of the Bradenton Area Convention Center Expansion project includes but not limited to the following: • Perform full building code evaluation of the building. (Hurricane wind speeds, flooding, electrical, etc.). • Evaluate all mechanical, electrical and generator systems. • Evaluation/renovation of the existing roof. • Design exterior improvements to the convention center to match and harmonize with the appearance of the proposed hotel. • Adding approximately 15,000 sq. ft. multi-purpose room to the North side of the Convention Center (900 seat ballroom) and an air-conditioned connector / corridor to the hotel, for an overall total of approximately 30,000 sq. ft.

Details

Architectural, Addition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents