Last Updated 04/01/2021 11:12 AM
Project Title

Refinishing of the Gymnasium Floors at Canyon View High School

Physical Address View project details and contacts
City, State (County) Cedar City, UT 84721   (Iron County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $56,611
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Iron County School District intends to sand, paint, seal and finish approximately 19,000 square feet of both the “Main” and “Auxiliary” gymnasiums at Canyon View High School. It is anticipated that the awarded contractor will sand to raw wood and apply two (2) coats of Bona Sport Seal, apply paint and logos as directed by documentation and pre-bid conference, including but not limited to, all Basketball and Volleyball lines in accordance with all UHSAA requirements. The “Main” gymnasium will have the inside of the 3-point lines stained a color determined by ICSD personnel. Auxiliary Gymnasium will have all game lines replaced as they currently stand. Staining of the key matching the color of the main gym stain. Please refer to all documentation within this IFB. Additional items include: 1. The successful bidder will be responsible for removing grills, athletic equipment, etc. as determined in the pre-bid conference. 2. Vendor is responsible to replace or repair any floor boards that are damaged. 3. The vendor must use approved sealant and approved finish per manufacturer’s specifications. 4. The game line must be painted with the paint colors and configuration to comply with all sport association requirements and be approved by Hunter Shaheen, ICSD Facilities Supervisor prior to application (Paint must be compatible with finish system and must be applied between seal and first coat offinish.) 5. After the floors are completed the successful bidder will be responsible for the reinstallation of any grills, athletic equipment, etc. as needed. 6. All clean up and disposal will be the responsibility of the vendor.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents