Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Geometric Improvements
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
Berlin, MD 21811

Fair Hill NRMA Phase 4 Paving
Post-Bid
Less than $50,000 est. value
Elkton, MD 21921

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Miscellaneous Roadway Structure Repairs at Various Locations in Dorchester, Somerset, Wicomico and Worcester Counties
Results
$500,001 to $1,000,000 est. value

Chip Seal Surfacing for Roadways
Results
Snow Hill, MD 21863

Permanent Patching of Asphalt Pavements at Various Locations
Results
$500,001 to $1,000,000 est. value

Slurry Seal Surfacing of Roadways
Results
Snow Hill, MD 21863

Berlin Street Resurfacing Project
Results
Berlin, MD 21811

Blacktop Surfacing of Roadways
Results
Snow Hill, MD 21863

Resurface Maintenance Lot at Janes Island State Park
Results
Less than $100,000 est. value
Snow Hill, MD 21863

Cabin 11 - Foundation Waterproofing, New Germany State Park, Garrett County
Results
Less than $50,000 est. value
Grantsville, MD 21536

Interstate 295 Miscellaneous Roadway Improvements
Results
$3,900,000 est. value
Wilmington, DE 19801

Pavement Maintenance
Term Contract
Results

Grading and Paving of Parking and Storage Area
Results
Snow Hill, MD 21863

Reported 06/26/2021 12:00 AM
Project Title

Concrete Driveway Removal & Asphalt Replacement

Physical Address View project details and contacts
City, State (County) Berlin, MD 21811   (Worcester County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work Consists of Providing all Labor, Materials and Equipment as Required to Repair (Driveway) at the USCG: - Demolition approximately 1472sqft of concrete sidewalk, lead walkway and driveway. - Remove all demolition waste/debris and haul to off-site disposal. - Back full and rough grade work area. - Materials: The Contractor shall provide all material. - The Contractor shall install 2" layer of GASB, crushed stone, fine grade and compact to driveway surface. - The Contractor shall lay hot asphalt material to approximately 1440sqft of required thickness 2.5/ 9.5mm (See attached Appendix A, area outlined in red). - The Contractor shall adjust water valve to finish grade of new asphalt driveway. - The Contractor shall machine lay and roll 2.5 inches 9.5mm Asphalt Surface and plate compact where machine rolling is not feasible. - The Contractor shall install new concrete sidewalk approximately 32sqft (See attached Appendix A, outlined area outlined in yellow). - The Contractor shall form new concrete sidewalk and pour 4 inch concrete slab with 3500 psi concrete using fiber reinforcement with broom finish. - Provide and install grass seed and mulch in areas where constructed any area disturbed during sidewalk/ driveway installation. - Clean up and restore the site for occupancy.)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents