Similar Projects
Replacement of 3 Compressors STA Duluth
Bidding
Duluth, MN 55802

Water Treatment Plant Rooftop Unit Replacements
Bidding
Bloomington, MN

HVAC Filters
Term Contract
Post-Bid
Anoka, MN 55303

MBC - Alerton Controls Services
Term Contract
Post-Bid
Minneapolis, MN

HVAC System Replacement
Results
Grand Rapids, MN 55744

HVAC Upgrades
Results
Minneapolis, MN 55411

Itasca State Park Shop Boilers Replacement
Bidding
$95,000 est. value
Park Rapids, MN 56470

Filter Replacement Services at PHA Properties
Post-Bid
Saint Paul, MN

Crooked Lake ES HVAC Replacement and Deferred Maintenance Phase 2
Results
Andover, MN 55304

Multiple Site Furnace Unit Replacement
Bidding
Mapleton, MN 56065

F108--Chemo Hood Vent Decontamination and Disposal St. Cloud
Post-Bid
Saint Cloud, MN

Johnson High School HVAC Replacement
Results
Saint Paul, MN 55106

Boiler Non Return Valve and Install
Renovation
Bidding
Faribault, MN 55021

Natatorium HVAC
Post-Bid
Rochester, MN

Franklin Elementary School HVAC Improvements 2020
Results
Mankato, MN 56001

Last Updated 04/15/2021 02:10 PM
Project Title

Data Room Cooling at the Judicial Building

Physical Address View project details and contacts
City, State (County) MN   (Ramsey County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $103,036
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

he work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Demolition of the existing non-functional cooling units and associated non-potable water piping. 2. Rebalancing of selected existing air terminals. 3. Installation of inline exhaust fans and associated ductwork, fire dampers, and grilles. Installation of a new split system cooling unit and associated piping and controls. 4. The creation of new pipe enclosures to conceal the new refrigerant piping in public spaces. 5. Extension of the existing campus wide building automation system to provide control and monitoring for the new equipment. 6. Electrical work necessary to provide power to the newly installed mechanical equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents