Similar Projects
Twin Towers Middle School Modernization
Renovation, Addition
Conception
Middletown, NY 10940

Van Burenville Road Solar
New Construction, Infrastructure
Conception
$5,000,000 est. value
Middletown, NY 10940

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Wastewater Treatment Plant Improvements - Contract No. 2 - Electrical Construction
Renovation
Sub-Bidding
$690,000 CJ est. value
Middletown, NY 10940

Small Electrical Services
Renovation
Post-Bid

Valley CSD - High School Auditorium Lighting Upgrades
Alteration
Post-Bid
Montgomery, NY 12549

Liebert UPS Preventive and Emergency Maintenance and Battery Replacement
Results
Goshen, NY 10924

Emergency Generators Maintenance Services
Results
Warwick, NY 10990

Newburgh CSD Phase 1 2019 Capital Improvement
Construction
Less than $650,000 est. value
Newburgh, NY 12550

Pine Bush CSD 2019 Capital Improvement Project Phase 2
Construction
Circleville, Pine Bush, NY 10919

Electrical, Plumbing, and HVAC Services
Alteration
Post-Bid
Middletown, NY

Kaplan Generator - Cummins or Equal
Results
NY

Florida UFSD - Capital Improvements Bond Phase II
Renovation
Construction
Florida, NY 10921

SYNOPSIS Third (3rd) Party Electrical Underwriter's Inspection / Third Party Electrical Underwriter's Inspection
Term Contract
Post-Bid
West Point, NY

James I. O'Neill Renovation Project
Renovation
Results
$89,000 to $736,000 est. value
Highland Falls, NY 10928

Last Updated 08/15/2022 03:01 PM
Project Title

Cornwall Central High School Cooling Tower Replacement Project - Electrical Construction

Physical Address View project details and contacts
City, State (County) New Windsor, NY 12553   (Orange County)
Category(s) Education, Single Trades
Sub-Category(s) Electric, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $44,639 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

It is the intention of this Project to be both environmentally and fiscally conscious of paper use and consumption. Therefore, documents will be distributed as digital sets. Bidding Documents, Drawings, and Specifications may be viewed online free of charge beginning May 27, 2022. All bid addenda will be transmitted to registered plan holders via e-mail and will be available on website. Each Bidder must deposit a Bid Security in the amount and form per the conditions provided in Instructions to Bidders. All Bids will remain subject to acceptance for forty-five (45) days after the Bid Opening. Owner may, in its sole discretion, release any Bid and return Bid Security prior to that date. A full performance bond, together with labour and material payment bonds in form acceptable to Owner, shall be required of the successful Bidder for the full contract amount. The award of bid pursuant to this notice is subject to appropriation of funds for this purpose in accordance with the applicable provisions of the General Municipal Law. All bids must meet the requirements of the General Municipal law of the State of New York and all other applicable statues and have attached statement of non-collusion. All documents submitted in connection with this bid will become the property of the Cornwall Central School District, and the district will not return bids or bid documents. Use this page to verify identification as a Bidder. Attendance at this meeting is requested as the Owner and Engineer will be present to discuss the Project. Attendees should anticipate a Q & A session, followed by a walk-thru of the respective spaces/buildings. The Engineer will transmit to all listed Bidders record of Addenda in response to clarifications arising from the Conference. Bids shall not include New York State sales and compensating use taxes on materials and supplies incorporated into the Work, the Owner being exempt therefrom. The Bidders must comply with New York State Department of Labour Prevailing Wage Rate Schedule and conditions of employment. The Board of Education of the Cornwall Central School District reserves the right to waive any informality in submitted bids, reject any or all bids, and to award contracts on its determination of the lowest responsible bidder.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents