Similar Projects
SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Asphalt Repair and Maintenance
Results
Less than $100,000 est. value

Colonade Roadway Project
Infrastructure
Results
Inverness, FL

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

SCOP Road Resurfacing of Citrus County CR491 from West Grover Cleveland Boulevard to West Ocala Street
Infrastructure
Results
$1,928,621 est. value
Lecanto, FL 34461

Residential Road Resurfacing FY 21/22
Infrastructure
Results
$4,750,000 est. value
Lecanto, FL

Road Resurfacing Project for West Citrus Springs Boulevard, North Deltona Boulevard and South Canary Palm Terrace
Infrastructure
Results
Citrus Springs, FL

SR 44 - Resurfacing
Infrastructure
Results
$2,475,900 est. value
FL

Asphaltic Concrete for Surface/Leveling Courses Including Sand Seal Coat
Infrastructure
Results
FL

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

Silicone Joint Sealer
Infrastructure
Results

SCOP Road Resurfacing Project for East Turner Camp Road, from East Banks Road to East Matthew Meadow Court
Infrastructure
Results
Inverness, FL 34450

SCOP Resurfacing Project for Forest Ridge Boulevard from CR 486 to West Lake Beverly Drive
Infrastructure
Results
Beverly Hills, FL 34465

District Wide Push Button Contract
Infrastructure
Results
$2,000,000 est. value

Miscellaneous Asphalt Repair
Infrastructure
Results
$100,000 est. value

Last Updated 07/12/2022 01:28 AM
Project Title

SCOP Road Resurfacing Project for E. Withlacoochee Trail from E. Scott Lane to SR 200

Physical Address View project details and contacts
City, State (County) Dunnellon, FL 34434   (Citrus County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide roadway milling and resurfacing services for two lanes of E Withlacoochee Trail, from E Scott Ln (western intersection) to SR 200, approximately .85 miles per lane (Attachment “A”). This includes milling 1.5”, then resurfacing with two (2) separate 1.5” lifts of FC 12.5 with PG 76-22 polymer binder. The work includes, but is not limited to, exposing and cleaning edge of existing pavement, milling, paving, temporary and permanent pavement markings/RPMs, redressing, shoulder grading (contractor is responsible for reestablishing/creating swales and providing positive drainage away from the roadway surface), sodding, and other items as specified in the Contract Documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents