Last Updated 11/13/2019 05:43 AM
Project Title

Rehabilitation - Orangeburg County

Physical Address View project details and contacts
City, State (County) SC   (Orangeburg County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Removal & Disposal Of Existing Pavement 250.000 Sy Removal & Disposal Of Existing Curb 85.000 Lf Borrow Excavation 5,116.000 Cy Excavation For Shoulder Paving 1,816.292 Sta Hauling Of Excavated Shoulder Material 1,816.292 Sta Maintenance Stone 209.950 Ton Hma Shoulder Widening Course 8,311.013 Ton Liquid Asphalt Binder Pg64-22 3,236.699 Ton Full Depth Asph. Pav. Patching 6" Unif. 17,925.000 Sy Full Depth Asph. Pav. Patching 8" Unif 3,070.000 Sy Milling Existing Asphalt Pavement 1.25" 14,050.000 Sy Milling Existing Asphalt Pavement 1.75" 14,550.000 Sy Milling Existing Asphalt Pavement 2.0" 19,600.000 Sy Milling Existing Asphalt Pavement (Variable) 43,915.000 Sy Milled-In Rumble Strip 32.910 Mi Hot Mix Asphalt Surface Course Type b 29,504.106 Ton Hot Mix Asphalt Surface Course Type c 5,109.040 Ton Hot Mix Asphalt Surface Course Type d 11,491.941 Ton Driveway Paving-Surface Type d 3,612.500 Ton Permanent Construction Signs (Ground Mounted) 7,548.000 Sf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 6,545.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 175,850.000 Lf 8" White Solid Lines Perm.Pvmt.Markings 250.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 1,015.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 14.000 Ea White Word Message "Stop Ahead" -Perm.Pvmt.Marking 1.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Perm.Pvmt.Marking 1.000 Ea White Lane Drop Arrow(Lt.Or Rt.)Perm.Pvmt.Marking 2.000 Ea Railroad Crossing Symbols - Perm.Pvmt.Marking 4.000 Ea Handicap Symbol - Perm.Pvmt Marking 1.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 21,086.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 83,760.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 15,700.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 397,470.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 2,880.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 5,132.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 15.000 Ea White Word Message "Only"-Fast Dry Paint 2.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 2.000 Ea Railroad Crossing Symbols - Fast Dry Paint 8.000 Ea Handicap Symbol - Fast Dry Paint 3.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 43,272.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 236,330.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 64.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 260.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 287.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 2,551.000 Ea 4" White Broken Lines- (Gaps Excld) - Single Component Hybridized Polymer– 20 Mils 1,305.000 Lf 4" White Solid Lines-(Pavement Edge Lines)-Single Component Hybridized Polymer–20 Mils 33,685.000 Lf 8" White Solid Lines-(Cross Walk & Channelization)-Single Component Hybridized Polymer–20 Mils 1,190.000 Lf 24" White Solid Lines-(Stop/Diagonal Lines)-Single Component Hybridized Polymer–20 Mils 1,551.000 Lf White Single Arrows (Left, Striaght, Right) Single Component Hybridized Polymer–20 Mils 6.000 Ea White Word Message "Only" - Single Component Hybridized Polymer– 20 Mils 2.000 Ea White Combination Arrow (Straight&Right Or Straight&Left) - Single Component Hybridized Polymer–20 Mils 001 1.000 Ea 4" Yellow Broken Lines (Gaps Excluded) - Single Component Hybridized Polymer - 20 Mils 550.000 Lf 4" Yellow Solid Lines (Pavement Edge & No Passing Zone) - Single Component Hybridized Polymer - 20 Mils 39,900.000 Lf Furnish & Install 1.0" Schedule 80 Pvc Conduit 105.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 1,400.000 Lf Sawcut For Loop Detector 425.000 Lf Catch Basin - Type 7(Top Only) 1.000 Ea Catch Basin - Type 9(Top Only) 1.000 Ea Concrete Curb And Gutter(1`-6") Vertical Face 20.000 Lf Concrete Curb And Gutter(2`-0") Vertical Face 30.000 Lf Concrete Curb And Gutter (3`-0") Vertical Face 35.000 Lf Detectable Warning Material 125.000 Sf Pedestrian Ramp Construction 250.000 Sy Surface Applied Detectable Warning 300.000 Sf Remove & Dispose Semi-Rigid Gr Device 980.000 Lf Mt3 Leading End Treatment Tl3 1.000 Ea Mb Trailing End Treatment 1.000 Ea Mgs3 Gr Standard Shoulder 920.000 Lf Permanent Grassing For Non-Permitted Resurfacing Projects 24.806 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents