Similar Projects
MUNI - Petco - Kerrville, TX / Petco Animal Supplies Store - SGA Design Group
New Construction, Infrastructure - 11,853 SF
Design
$2,860,000 CJ est. value
Kerrville, TX 78028

2022 Slurry Seal Project
Infrastructure
Bidding
$82,000 est. value
Kerrville, TX

SH0173 - Flexible Pavement Structure Repair
Infrastructure
Bidding
$1,046,537 CJ est. value
Center Point, TX 78010

Kerrville State Hospital Laundry Facility - Sub Bid
New Construction, Infrastructure, Renovation
Post-Bid
Kerrville, TX 78028

Kerrville State Hospital Laundry Facility - Sub Bid
New Construction, Infrastructure, Renovation
Post-Bid
Kerrville, TX 78028

Acid Wash Swimming Pool
Results

2021 Street Reconstruction
Results
Kerrville, TX

O'Reilly Auto Parts Store / Ingram
New Construction, Infrastructure - 7,307 SF
Post-Bid
$277,666 CJ est. value
Kerrville, TX 78028

2021 Group Seal Coat Program
Results

2022 Street Repair of Chihuahua Street and River Road. Intersection, and Preservation of Lauren Court, Hillcrest Drive, and Kyle Street
Infrastructure
Post-Bid
$700,000 est. value
La Vernia, TX

US0083 - Crack Seal
Infrastructure
Results
$164,520 est. value
TX

2021 Street Maintenance Project
Infrastructure
Results
Kerrville, TX

IH0010 - Limestone Rock and Asphalt
Infrastructure
Results
$282,750 est. value
TX

2021 Slurry Seal Project
Infrastructure
Results
Kerrville, TX

Ranchero Road Reconstruction Project Phase I
Infrastructure
Results
$662,392 est. value
Kerrville, TX 78028

Last Updated 08/02/2022 12:07 PM
Project Title

Improve Singing Wind Park - City of Kerrville

Physical Address View project details and contacts
City, State (County) Kerrville, TX 78028   (Kerr County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Maintenance, Park/Playground, Paving/Reconstruction, Site Development, Swimming Pool(s)
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A full scope has not been determined. As of August 2, 2022, this project is in the conceptual phase. Information regarding design team and contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Excavation and Fill.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents