Similar Projects
Safe Place of the Permian Basin - Phase 1
New Construction
Conception
$22,500,000 est. value
Midland, TX 79703

Northwest Transportation & Maintenance Facility
New Construction
Conception
$21,545,000 est. value
Katy, TX

Pinnacle Montessori Academy
New Construction - 17,300 SF
Design
$3,000,000 est. value
Fate, TX 75087

Kiddie Academy
New Construction - 11,968 SF
Design
$3,000,000 est. value
Northlake, TX

Design Build Child Development Center, Lackland AFB, Texas
- 9,911 SF
Post-Bid
$10,000,000 to $25,000,000 est. value
TX

Make A Wish Daycare and Retail Center Shell
New Construction - 18,558 SF
Post-Bid
$2,300,000 est. value
San Antonio, TX 78214

Early Childhood Center Number 2 - Base Proposal
New Construction - 78,000 SF
Results
Less than $21,400,000 est. value
Houston, TX 77083

Early Childhood Center Number 2 - Alternate Proposals
New Construction - 78,000 SF
Results
Less than $21,400,000 est. value
Houston, TX 77083

Ivy Kids Learning Center
New Construction - 15,484 SF
Construction
$2,800,000 est. value
Spring, TX 77379

Vickery Meadows Youth Development Foundation
New Construction - 25,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Dallas, TX 75231

New Early Childhood Center
New Construction
Pending Verification
Longview, TX

New Gibbs Support Learning Center Renovations
Renovation
Conception
Huntsville, TX 77340

Pinnacle Montessori Academy
New Construction - 11,300 SF
Design
$2,400,000 est. value
Celina, TX 75009

Children of America
New Construction
Post-Bid
Austin, TX

Construction Manager-at-Risk Services for the Construction of an Early Learning Academy
New Construction
Results
Less than $10,000,000 est. value
Baytown, TX 77521

Last Updated 05/16/2022 03:29 PM
Project Title

Trinity Basin Pre-K -8 New School / Arlington Campus

Physical Address View project details and contacts
City, State (County) Arlington, TX 76018   (Tarrant County)
Category(s) Education
Sub-Category(s) Pre-School/Daycare
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $24,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of an educational facility in Arlington, Texas. Completed plans call for the construction of a 82,550-square-foot, two-story above grade educational facility; and for site work for a educational facility. Plans call for the construction of an 82,550 square foot, 2-story school at 6301 S Collins Street, Arlington, Texas. Please direct all inquiries to the construction manager. SEDALCO is the Construction Manager at Risk for this project that includes two (2) New PK - 8th Grade Schools! The building on each site is identical with site adaptations for each location.

Details

Pre-School/Daycare, 2 Stories Above Grade, 82,550 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents