Similar Projects
Crooked Lake ES HVAC Replacement and Deferred Maintenance Phase 3
Alteration
Bidding
Andover, MN 55304

HVAC Filters
Term Contract
Post-Bid
Anoka, MN 55303

HVAC and Mechanical Products
Term Contract
Post-Bid

Crooked Lake ES HVAC Replacement and Deferred Maintenance Phase 2
Results
Andover, MN 55304

Madison Elementary School HVAC Replacement and Deferred Maintenance - Phase 2
Results
Blaine, Minneapolis, MN 55434

Maintenance and Repair for Chillers at Anoka Metro Regional Treatment Center
Term Contract
Post-Bid
$15,000 to $20,000 est. value
Anoka, MN 55303

Monroe Elementary School HVAC Replacement and Deferred Maintenance - Phase 3
Results
Anoka, MN

2021 Concourse B Heating Upgrades P1
Renovation
Post-Bid
Minneapolis, MN

Valley View Elementary School Boiler Plant
Results
Columbia Heights, MN 55421

2021 Westwood Middle School Chiller Replacement
Alteration
Post-Bid
Blaine, MN 55434

Hamilton Elementary School HVAC Replacement and Deferred Maintenance - Phase 1
Results
Coon Rapids, MN 55433

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

2021 HVAC Unit Replacements at Savannah Oaks
Term Contract
Results
Ramsey, MN 55303

HVAC Systems and Related Services
Alteration
Post-Bid

Boiler Maintenance and Repairs
Results
Minneapolis, MN

Last Updated 11/01/2021 05:05 AM
Project Title

Franklin O and M Facility Geothermal Systems Modifications

Physical Address View project details and contacts
City, State (County) Minneapolis, MN   (Anoka County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Modifications to the existing geothermal system includes new primary circulation pumps, new bypass filter housing units, new manual shut off valves with cross- over bridge piping for make-up air (MUA) units 5-8, replacement of pumps in MAU units 5-8, replacement of the cooling coil & pump in DC-1, removal of existing piping into the second-floor mechanical room, and testing & repairing above ground geothermal loops at the manifolds.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents