Similar Projects
The Village at Loretto Heights
New Construction, Renovation
Conception
Denver, CO 80236

Acoustic Renovation
Renovation
Design
Boulder, CO

Steamboat Storage Facility General Contractor
New Construction
Bidding
Steamboat Springs, CO 80487

HLMS-Renovation
Renovation
Bidding
$64,000,000 est. value
Boulder, CO

Ucb000270-Stne-Kitchen Maintenance-2021-Rfp-Dbb
Post-Bid
Less than $544,000 est. value

Ucb000270-Stne-Kitchen Maintenance-2021-Rfp-Dbb
Post-Bid
Less than $544,000 est. value

Gunter Renovation for Nursing Simulation Labs 2090, 2130
Renovation
Results
Less than $450,000 est. value
Greeley, CO 80639

Cu Anschutz Pn20-125493
Renovation
Results
Less than $3,078,000 est. value
Denver, CO

Learning Commons Remodel
Construction
Leadville, CO 80461

Cira Commons - Building Core and Shell
Construction
Less than $925,000 est. value
Fort Collins, CO 80521

Trinidad POE Remodel Project
Renovation - 1,074 SF
Bidding
$115,000 est. value
Trinidad, CO 81082

Ucb000246-Stne-Building Skin Maintenance-2021
Term Contract
Post-Bid
Less than $375,000 est. value

North Quad Renovation
Renovation
Results
Less than $537,856 est. value
Aurora, CO 80011

Bld-123 Lab Remodel - Center for Chemical and Biological Analysis
Renovation
Construction
Less than $150,000 est. value
Denver, CO 80204

RBL NIAID Building Improvement Grant
Renovation
Bidding
Fort Collins, CO 80521

Last Updated 02/21/2022 10:52 AM
Project Title

Moby Arena Basketball Locker Room Revitalization

Physical Address View project details and contacts
City, State (County) Fort Collins, CO   (Larimer County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Construction Commenced 2022, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design/Build (D/B) Entities. Using a Design/Build (D/B) Guaranteed Maximum Price (GMP) acquisition and contracting strategy, CSU intends to renovate approximately 8,000 sqft of space in the north, lower level of the Moby Arena Complex to accommodate a new best-of-peer locker room experience for the CSU NCAA Division I men’s and women’s basketball teams.

Details

8,000 SF - College/University, 8,000 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents