Similar Projects
Bridges and Box Culvert Renovations at Wind Cave National Park
Design
$250,000 to $500,000 est. value
Hot Springs, SD

City Parking Lots ADA Parking Spaces
Bidding
Rapid City, SD

Asphalt Overlay and Asphalt Patching
Bidding
Brookings, SD 57006

3/4 Inch Surfacing Gravel
Post-Bid
Huron, SD

SD NPS Pp 2020(1), Pavement Preservation South
Post-Bid
SD

Gateway Boulevard (CR106) Phase 2 Improvements
Results
Less than $14,500,000 est. value
Tea, SD 57064

Gateway Boulevard (CR106) Phase 2 Improvements
Results
Less than $14,500,000 est. value
Tea, SD 57064

Minnesota Ave Reconstruction & Utility Improvements
Bidding
$2,617,090 est. value
Sioux Falls, SD

East Watertown Street Water Main Replacement
Post-Bid
Rapid City, SD 57701

2021 Douglas/Washington Streets
Results
Elk Point, SD 57025

Water Main Improvement 2021-2
Bidding
Madison, SD

Saint Patrick Street Reconstruction
Post-Bid
Rapid City, SD 57701

North Rochford Road and Hanna Road Mill and Asphalt Overlay - Phase 4
Results
$700,020 est. value
Central City, SD 57754

Pavement Improvements
Bidding
$377,000 est. value
Kranzburg, SD

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Reported 03/30/2021 12:00 AM
Project Title

Avon Main Street Reconstruction

Physical Address View project details and contacts
City, State (County) Avon, SD   (Bon Homme County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Completion Expected October 2021
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of 1) Remove and salvage 9,992 SY of PCC Pavement, as well as 1,899 SY of concrete sidewalk. Other removal item include existing street signs, light poles, and underground utilities; 2) Furnish and install approximately 913 LF of 8” PVC water main with 25 services and 926 LF of 8” PVC sewer main with 31 services and associated appurtenances; 3) Perform grading and install gravel cushion material for PCC paving installation; 4) Install PCC pavement, curb and gutter, and sidewalk as shown in the Contract Drawings, and; 5) Perform associated functions such as erosion control, traffic control, seeding, and coordination of new light pole installation.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents