Similar Projects
South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Resurfacing - SR 8
Infrastructure
Bidding
$17,108,404 CJ est. value
Glen Saint Mary, FL 32040

Resurfacing - SR 8
Infrastructure
Bidding
$17,108,404 CJ est. value
Glen Saint Mary, FL 32040

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Silicone Joint Sealer
Infrastructure
Results

District Two Bridge Tending Services
Infrastructure
Results

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

SR 25 (US 41 / US 441) from I-75 (SR 93) to CR 252
Infrastructure
Post-Bid
$9,805,526 est. value

Baker County Transportation Facility Bus Wash Building
New Construction, Infrastructure
Results
$478,093 CJ est. value
Macclenny, FL 32063

Baker County Central Fire Rescue Station Paving
Infrastructure
Post-Bid
Glen Saint Mary, FL 32040

Safety Project/Pavement Markings - Districtwide Safety Push Button, on System (2nd)
Infrastructure
Results
$999,993 est. value

Routine Mechanized Road/Bridge Sweeping
Infrastructure
Post-Bid
$150,000 est. value
Sanderson, FL

Edging and Sweeping Sidewalks, Driveways, and Curb and Gutters
Infrastructure
Results
$200,000 est. value

Last Updated 07/25/2023 03:44 PM
Project Title

Resurfacing - SR 121

Physical Address View project details and contacts
City, State (County) Macclenny, FL 32063   (Baker County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $7,484,995 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 25,2023, project was awarded to Preferred Materials Inc., awarded amount is $7,484,994.68. Counties: Baker Road Name: SR 121 Limits: From Union County Line to South of Sr 8 (I-10) Project(s): 44543615201(*) Federal Aid No: D222074B Total Roadway Length: 9.027 Miles Contract Days: 250 Total Bridge Length: 0.414 Miles Total Proposal Length: 9.027 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Days The Improvements under this Contract consist of Milling & resurfacing, base work, shoulder treatment, drainage improvements, highway signing, sidewalks, and other incidental construction on SR 121 in Baker County from Union County Line to South of I10 (SR 8). For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 011 Resurfacing - SR 121

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents