Similar Projects
Slate Valley Walking Trail
New Construction - 3,600 SF
Design
Less than $15,000 est. value
Poultney, VT 05764

Schmanska Park Pathways Construction
Infrastructure
Bidding
$30,000 est. value
Burlington, VT 05401

Schmanska Park Pathways Construction
Infrastructure
Bidding
$30,000 est. value
Burlington, VT 05401

Slip Formed Concrete Curbing 2020
Post-Bid
Rutland, VT

STP CVRT(2) - Winooski River Bridge and Bike Path Construction
Post-Bid
Montpelier, VT

West Rutland Sidewalk Segments STP BP15(1)
Results
$500,000 to $1,000,000 est. value
West Rutland, VT 05777

Kocher Drive - STP Sidewalk (12) and STP BP18(014)
Results
$500,000 to $1,000,000 est. value
Bennington, VT 05201

IQ004 Indefinite Delivery / Indefinite Quantity Primary Contracts -Contractor On-Ramp
Post-Bid
Montpelier, VT 05633

East Montpelier STP BIKE (63)
Results
$500,000 to $1,000,000 est. value
East Montpelier, VT 05651

Sidewalk to Missisquoi Valley Union High School Swanton STP BP19(5)
Post-Bid
Swanton, VT

Mt. Philo Summit Trail Reconstruction
Results
Charlotte, VT

Lyndon Town School Sidewalks
Post-Bid
Lyndonville, VT 05851

Fair Haven Rest Area Sidewalk Replacement
Results
$24,345 est. value
Fair Haven, VT

Concrete Sidewalk Installation
Post-Bid
Rutland, VT 05702

CY-20 Sidewalk Program
Results
$900,000 to $1,200,000 est. value
Burlington, VT

Reported 06/17/2021 11:09 AM
Project Title

2021 Sidewalk Replacement Project

Physical Address View project details and contacts
City, State (County) Bristol, VT   (Addison County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of approximately 600 linear feet of sidewalk in on the north side of East Street from Mountain Street eastward and approximately 100 linear feet on the east end of Park Place. Most of the sidewalk sections are currently four feet (4’) wide and many are deteriorated and/or have depressions, which create trip hazards, pool water, and interfere with winter maintenance operations. The replaced sidewalks should be five feet (5’) wide wherever possible.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents