Similar Projects
Water Well Replacement at Fritsche Park, Precinct 4
Infrastructure
Bidding
TX

Water Well No. 2 Site Improvements
Infrastructure
Bidding
$1,366,000 est. value
Clear Lake City, TX

Water Wells for Big Sky Estates Phase 1
Post-Bid
$700,000 est. value
Denton, TX 76201

Saws Water Well Mitigation Program
Post-Bid
Less than $95,000 est. value
San Antonio, TX 78212

Repair and Install Variable Frequency Drive on Irrigation Well 8
Results
Bushland, TX 79012

Water Treatment Plant Facilities Pump and Motor Maintenance and Repair Services
Results
Less than $2,762,500 est. value
Round Rock, TX 78664

Rehabilitation of Water Well 8
Infrastructure
Bidding
College Station, TX

Pump, Submersible, 2", Discharge, Trash
Post-Bid
Houston, TX 77251

Dane Street Water Well
Results
$1,212,885 est. value
Aubrey, TX 76227

2021 Water Well Upgrade
Infrastructure
Bidding
Little Elm, TX

MHF80 Single Stage Vacuum Pump
Post-Bid
Houston, TX 77251

Micron Pump Station Well Pump No. 4 - Micron Well Fit Out P2
Results
Less than $1,800,000 est. value
San Antonio, TX 78251

Big Sky Estates Water Wells
New Construction
Post-Bid
TX

Water Well No. 2
Results
TX

Water Distribution Improvements Phase III Ground Storage Pump Improvements
Post-Bid
Cameron, TX 76520

Last Updated 09/30/2021 08:26 AM
Project Title

Replace Hydronic Piping, Pumps, Valves and Insulation

Physical Address View project details and contacts
City, State (County) College Station, TX   (Brazos County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $716,258
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Remove, dispose of and replace selected hydronic piping, isolation valves, associated appurtenances, insulation and supports. Remove, dispose of and replace sump pumps with self-priming surface mounted sump pumps, controls, and level monitoring appurtenances with early detection alarm to the Communications Center. This project shall follow all TAMUS Facility Design Guidelines.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents