Similar Projects
Murphy Express
New Construction - 2,800 SF
Conception
Lubbock, TX 79413

Murphy Express
New Construction - 2,800 SF
Conception
$500,000 to $1,000,000 CJ est. value
Lubbock, TX 79424

Buffalo Wild Wings
Renovation - 7,582 SF
Design
$250,000 est. value
Lubbock, TX 79407

Taco Bell
Renovation - 3,000 SF
Design
$400,000 est. value
Lubbock, TX 79424

New Middle School - 2020 Frenship ISD
New Construction
Post-Bid
Lubbock, TX

The Fresh American
New Construction - 10,421 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Lubbock, TX

Wausau Avenue Paving
Results
Lubbock, TX 79405

Brick Paving Project 13th Street and Texas Avenue
Results
$722,000 est. value
Lubbock, TX 79416

Murphy Express #8985
New Construction - 2,800 SF
Construction
$1,100,000 est. value
Lubbock, TX 79424

Starbucks Shell
New Construction - 2,200 SF
Construction
$800,000 est. value
Lubbock, TX 79407

Kobe Japanese Steak House and Sushi Bar
Build-Out - 6,000 SF
Pending Verification
$350,000 est. value
Lubbock, TX 79424

West Side Pizza
Build-Out - 1,983 SF
Pending Verification
$172,000 est. value
Lubbock, TX 79424

Nashbird Chicken Restaurant
New Construction - 2,550 SF
Conception
$500,000 to $1,000,000 CJ est. value
Lubbock, TX

Murphy Express #8600 / Lubbock
New Construction, Infrastructure - 2,824 SF
Design
$2,500,000 CJ est. value
Lubbock, TX 79423

14th Street Plaza and East Green Project
New Construction, Infrastructure
Post-Bid
$1,200,000 CJ est. value
Lubbock, TX 79401

Last Updated 11/10/2022 11:31 AM
Project Title

Toot n Totum - Lubbock

Physical Address View project details and contacts
City, State (County) Lubbock, TX 79424   (Lubbock County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 10, 2022 construction is under way.

Details

6,767 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents