Similar Projects
Influent Wet Well Rehabilitation - City of St. Petersburg
Infrastructure
Conception
$450,000 CJ est. value
Elwyn, PA 19063

Southwest Acidize 8 Wells - City of St. Petersburg
Infrastructure
Conception
$1,500,000 CJ est. value
Elwyn, PA 19063

Pigeon Creek Pump Station Outfall and West Alley Repairs Project - REBID
Infrastructure
Bidding
$90,000 CJ est. value
Monongahela, PA 15063

Pocopson Elementary School Pump Station Project
Infrastructure
Bidding
$152,000 CJ est. value
West Chester, PA 19382

Pump Station 2 Grinder Project
Post-Bid
Gilbertsville, PA

George R. Sweeney Water Treatment Plant Raw Water Pump Station Upgrades - General/Mechanical
Addition
Post-Bid
Greensburg, PA

Furnishing 35 Grinder Pumps and 2 Spare Grinder Pump Cores
Results
Johnstown, PA 15904

East Headworks - General Construction
Results
$78,474,915 est. value
Pittsburgh, PA

Maple Grove Sewage Pumping Station and Interceptor Expansion - General Construction
Construction
$1,400,000 est. value
Lancaster, PA 17603

East Halls Pump Station Upgrades
New Construction, Demolition
Construction
$1,980,000 est. value
University Park, PA

Cleaning Out and Plugging Ten Orphan Wells
Infrastructure
Bidding
$5,000,000 CJ est. value
Sewickley, PA 15143

Bridgeport Pump Station Pump 2 Replacement
Addition
Post-Bid
Mount Pleasant, PA

Pump Station Monitoring Installation
Results
McClellandtown, PA

Miller Road Sewage Pumping Station Expansion - Contract No. 4 - Force Main
Addition, Demolition, Renovation, Infrastructure
Construction
$2,071,083 CJ est. value
Elizabethtown, PA 17022

Mingo Creek Pumping Station Betterment - General and Electrical Construction
Renovation, Infrastructure
Bidding
$4,000,000 CJ est. value
Philadelphia, PA 19153

Last Updated 10/27/2022 05:07 AM
Project Title

Lift Station Engineering Rehab/Replacement - City of St. Petersburg

Physical Address View project details and contacts
City, State (County) Elwyn, PA 19063   (Delaware County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $2,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Lift Station Engineering Rehab/Replacement A detailed scope has not yet been determined This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of October 27, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents