Similar Projects
208th Street East/Mountain Highway Extension - Pierce County
Infrastructure
Conception
$10,598,000 est. value
Spanaway, WA 98387

Burnham Drive Apartments
New Construction, Infrastructure
Design
$30,000,000 est. value
Gig Harbor, WA 98332

Chambers Creek Road / Chambers Lane Phase 1
Infrastructure
Bidding
$200,000 CJ est. value
University Place, WA 98467

Drainage Improvement Project 24th Street East and 122nd Avenue East
Infrastructure
Bidding
$270,460 CJ est. value
Edgewood, WA 98372

Spanaway Transit Center
New Construction, Infrastructure
Post-Bid
$4,800,000 CJ est. value
Spanaway, WA 98387

112th Street Southwest Water Main Replacement
Infrastructure
Post-Bid
$757,255 est. value
Lakewood, WA 98499

Water Main Replacement Phases 2 and 3
Infrastructure
Results
Puyallup, WA 98371

Toscanos Sinkhole Repair and Drainage
Infrastructure
Results
$550,000 to $650,000 est. value
Puyallup, WA

Apply Asphalt in Paradise Picnic Area
Infrastructure
Bidding
$9,000 CJ est. value
Ashford, WA 98304

39th Avenue Southwest Phase 4 Halcyon Water Main Replacement
Infrastructure
Post-Bid
$388,000 est. value
Lakewood, WA 98499

JBLM North Access Improvement
Infrastructure
Results
$12,000,000 est. value
Lakewood, WA

Septic System Replacement
Infrastructure
Post-Bid
$100,000 CJ est. value
Tacoma, WA 98446

Kansas Street Southwest Outfall Replacement and Calistoga Street West Improvements Project
Infrastructure
Results
$350,000 est. value
Orting, WA 98360

Frontier Park Horse Arena Cover
Alteration
Post-Bid
$1,600,000 est. value
WA

SR 162 East Water Main Replacement Phase 2 and 3
Infrastructure
Results
$200,000 est. value
Puyallup, WA 98375

Last Updated 08/03/2022 12:42 AM
Project Title

Wholesale Transmission Main Extension Schedule H Spanaway Extension

Physical Address View project details and contacts
City, State (County) Lakewood, WA   (Pierce County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $907,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The banner will not be placed on the website until the morning of the bid opening. Bids received after the time fixed for opening will not be accepted. Work to be performed includes: The work to be performed under this Contract is the installation of approximately 1,500 linear feet of bonded 12-inch-diameter push-on and restrained joint ductile iron pipe, and approximately 1,600 linear fi_et of fusion welded HDPE pipe, appurtenances, and restora-tion. While most of the pipe and appurtenances have been pre-pur-chased, the Contractor shall pro-vide and install all water system materials, including water main and fittings necessary to complete the project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents