Similar Projects
Garfield/22nd Bridge Improvement - City Of Decatur
Infrastructure
Conception
$1,100,000 CJ est. value
Decatur, IL 62526

Decatur Raw Water Pipeline From Sludge Lagoon - City of Decatur
Infrastructure
Conception
$960,000 CJ est. value
Decatur, IL 62523

Millikin University Student-Athlete Facility
New Construction, Infrastructure, Renovation - 10,870 SF
Design
$6,700,000 CJ est. value
Decatur, IL 62522

Door and Window Replacement: Stephen Decatur Middle School
Renovation
Bidding
$3,624,000 CJ est. value
Decatur, IL 62526

Longitudinal Joint Repair - I-72
Infrastructure
Bidding
$862,223 CJ est. value
Decatur, IL 62526

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Water System Improvements Phase 2 - Watermain Replacement
Infrastructure
Post-Bid
$1,212,875 CJ est. value
Blue Mound, IL 62513

2022 Roof Repairs And Replacements
Alteration
Results
Decatur, IL 62522

2022 Roof Repairs And Replacements
Alteration
Results
Decatur, IL 62522

A-O Grade School Pavement Rehabilitation
Infrastructure
Construction
$333,852 CJ est. value
Oreana, IL 62554

Archer Daniels Midland Company Protein Processing Plant Expansion
New Construction, Infrastructure
Pending Verification
$300,000,000 CJ est. value
Decatur, IL 62526

HSHS St. Mary's Hospital Renovation
Addition, Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Decatur, IL 62521

South Water Treatment Plant(SWTP) - Additional Water Reservoir - City of Decatur
Renovation, Infrastructure
Conception
$3,850,000 CJ est. value
Decatur, IL 62521

Demolition/Construction of a Concrete Pad at Sinawik Park
Infrastructure
Post-Bid
$1,496,000 CJ est. value
Decatur, IL 62521

HLS Summer 2022 Project
Renovation, Alteration
Results
$250,000 to $300,000 est. value
Warrensburg, IL 62573

Last Updated 07/18/2023 09:10 AM
Project Title

New K-8 Magnet School

Physical Address View project details and contacts
City, State (County) Decatur, IL 62526   (Macon County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $24,990,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors are invited to submit an offer for the New K-8 Magnet School. The project consists of a new K-8 school of approximately 81,500 sf, including associated sitework. A single stipulated sum bid will be received for all Work. A Bid Bond and Performance and Payment Bond will be required. The Owner reserves the right to accept or reject any or all offers, or to waive any informalities in the bidding. The successful bidder must agree to conform to the current rules and regulations of the Fair Employment Practices Commission. Attention is called to Minority Business Enterprise and Minority Workforce Participation goals. Attention is called to the provisions of Equal Employment Opportunity Contractor shall not pay less than the prevailing rates of wages as determined by the Illinois Department of Labor to all laborers, workers and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Prevailing Wage Act (820 ILCS 130/1-12). The project consists of a New K-8 Magnet School of approximately 81,500 sf. The work includes concrete, architectural precast wall panels, structural steel, masonry, casework, roofing, aluminum storefront, glazing, interior finishes, metal stud & gypsum partitions, flooring, painting, and associated mechanical and electrical systems, as well as associated sitework. The project site is located at 2160 W. Center Street, Decatur, IL. B. GHR, the MEP Consultant overview of MEP systems. C. Items furnished by the Owner for final connection or installation by the Contractor include the following: a) Main Electrical Switchgear. b) Packaged Air Cooled Chillers. c) Playground equipment.

Details

81,500 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents