Similar Projects
Davis Islands Bridge 105606 Repair
Post-Bid
Less than $365,800 est. value
Tampa, FL 33602

PSL Bridge Deck Replacement
Post-Bid
Port Saint Lucie, FL 349845099

Philippe Park Pedestrian Bridge
Results
$463,335 est. value
Safety Harbor, FL

I-275 HFB TBNext Section 3
Results

Sun Island Exit Bridge Over Boca Ciega Bay - Bridge #157601
Renovation
Construction
South Pasadena, FL

Bridge Related Repairs
Post-Bid
Saint Petersburg, FL 33731

Urban Core Riverfront Revitalization and Complete Streets - Hart Bridge Expressway and Talleyrand Connector
Results
Less than $30,962,163 est. value
Jacksonville, FL

Phase 2 Mastadon Bridge Project (Construction)
Post-Bid
Inglis, FL

Cedar Hammock CDD Lake Bulkhead and Bridge Replacement and Repair
Results
$3,143,368 est. value
Naples, FL

Bridge-Preventative Maintenance and Emergency Repair Services
Term Contract
Post-Bid
Dunedin, Indian Shores, Tarpon Springs, FL

SR 15A (Pine Avenue) Pedestrian Bridge/Sidewalk Improvement Project
Results
Green Cove Springs, FL 32043

Bridge Maintenance and Repairs
Term Contract
Results
Fort Myers, FL

Peace Way Over Drainage Ditch Bridge Repairs
Results
FL

R and R Intermediate Bridges
Results
Less than $390,488 est. value
FL

Repair and Reposition Elastomeric Bearing Pads - Dave Rawls Flyover Bridge
Results
Less than $126,950 est. value
Jacksonville, FL 32226

Last Updated 04/08/2020 08:16 AM
Project Title

Bascule Bridge Rehabilitation

Physical Address View project details and contacts
City, State (County) FL   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,111,925
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of replacement and relocation of span locks with associated structural steel modifications, strengthening of bascule pier support girders, replacement of fender timber components with composite lumber,replacement of associated fender hardware and wire ropes, and salvaging and re-installation of navigation lights with associated temporary lighting and electrical work at SR 3 (North Courtenay Pkwy.) over Canaveral Barge Canal (Bridge Nos. 700072 and 700201) in Brevard County. Section 0001 Structures 0110- 82- Remove & Dispose Of Structural Timber Mb 26.600 0460- 1- 15 Structural Steel - Rehabilitation, Miscellaneous Lb 56,600.000 0465- 2-105 Movable Bridge Machinery & Casting-Rehabilitation, f&i Span Locks As 4.000 0465- 2-605 Movable Bridge Machinery & Casting-Rehabilitation,Remove & Dispose-Contractor Owns, Span Locks As 4.000 0465- 3- 17 Movable Bridge Counterweight, f&i, Balance Blocks Ea 1,390.000 0465- 3- 19 Movable Bridge Counterweight, f&i, Steel Ballast Tn 12.700 0465- 3- 50 Movable Bridge Counterweight, Adjust Ea 4.000 0465- 20- Movable Bridge- Preventative Maintenance & Routine Repair (44326915201) Ls 1.000 0465- 21- Movable Bridge Operator Da 180.000 0465- 71- 1 Moveable Bridge Functional Checkout, Phase a (44326915201) Ls 1.000 0465- 71- 3 Movable Bridge Functional Checkout, Phase c (44326915201) Ls 1.000 0471- 1- 1 Fender System,Plastic Marine Lumber,Reinforced Mb 30.500 0471- 1- 2 Fender System,Plastic Marine Lumber, Non-Reinforced Mb 5.000 0504- 1- 1 Roadway Floor, Steel, 5" Open Sf 382.000 0507- 70- Aluminum Sidewalk Floor Sf 148.000 0508- 4- Movable Bridge Electrical Equipment, Rehabilitation (44326515201) Ls 1.000 0515- 1- 2 Pipe Handrail - Guiderail, Aluminum Lf 72.000 Section 0002 Roadway 0101- 1- Mobilization (44326515201) Ls 1.000 0101- 1- Mobilization (44326915201) Ls 1.000 0102- 1- Maintenance Of Traffic (44326515201) Ls 1.000 0102- 1- Maintenance Of Traffic (44326915201) Ls 1.000 0102- 2- 1 Special Detour 1 (44326915201) Ls 1.000 0102- 4- Pedestrian Special Detour (44326915201) Ls 1.000 0102- 14- Traffic Control Officer Hr 80.000 0102- 60- Work Zone Sign Ed 15,000.000 0102- 61- Business Sign Ea 3.000 0102- 71- 16 Temporary Barrier, f&i, Free Standing Lf 378.000 0102- 71- 26 Temporary Barrier, Relocate, Free Standing Lf 315.000 0102- 74- 1 Channelizing Device- Types i, Ii, Di, Vp, Drum, Or Lcd Ed 40,900.000 0102- 74- 2 Channelizing Device, Type Iii, 6` Ed 1,600.000 0102- 74- 7 Channelizing Device- Pedestrian Lcd (Longitudinal Channelizing Device) Lf 305.000 0102- 75- 1 Temporary Separator, f&i Remove Lf 2,235.000 0102- 76- Arrow Board / Advance Warning Arrow Panel Ed 400.000 0102- 78- Temporary Retroreflective Pavement Marker Ea 507.000 0102- 89- 1 Temporary Crash Cushion, Redirective Option Lo 5.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 1,284.000 0102-104- Temporary Signalization And Maintenance, Intersection Ed 600.000 0102-107- 1 Temporary Traffic Detection And Maintenance,Intersection Ed 600.000 0102-913- 21 Removable Tape, White, Solid 6" Gm 2.074 0102-913- 23 Removable Tape, White, 24" Stop Bar Lf 65.000 0102-913- 24 Removable Tape, White, 12" Crosswalk Lf 802.000 0102-913- 29 Removable Tape, White, Message, Symbol Or Arrow Ea 3.000 0102-913- 31 Removable Tape, Yellow, Solid, 6" Gm 1.131 0104- 11- Floating Turbidity Barrier Lf 1,615.000 0527- 2- Detectable Warnings Sf 87.000 0999- 25- Initial Contingency Amount, Do Not Bid (44326515201) Ls 1.000 0999- 25- Initial Contingency Amount, Do Not Bid (44326915201) Ls 1.000 Section 0003 Signing 0700- 1- 50 Single Post Sign, Relocate As 2.000 0700- 2- 50 Multi- Post Sign, Ground Mount, Relocate As 1.000 0710- 90- Painted Pavement Markings, Final Surface (44326915201) Ls 1.000 0711- 11-160 Thermoplastic, Standard, White, Message Or Symbol Ea 1.000 0711- 16-201 Thermoplastic, Standard-Other Surfaces, Yellow, Solid, 6"Gm 0.144 Section 0004 Signalization 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 13.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 146.000 0630- 2- 14 Conduit, Furnish & Install, Aboveground Lf 142.000 0632- 7- 1 Signal Cable- New Or Reconstructed Intersection, Furnish & Install Pi 3.000 0635- 2- 11 Pull & Splice Box, f&i, 13" x 24" Cover Size Ea 4.000 0646- 1- 11 Aluminum Signals Pole, Pedestal Ea 2.000 0653- 1- 11 Pedestrian Signal, Furnish & Install Led Countdown, 1 Way As 2.000 0665- 1- 12 Pedestrian Detector, Furnish & Install, Accessible Ea 2.000 Section 0005 Utilities 0508- 4- Movable Bridge Electrical Equipment, Rehabilitation (44326915201) Ls 1.000 0508- 78- 1 Movable Bridge-Rehab, Limit Switches & Transducers f&i (44326915201) Ls 1.000 0508- 78- 4 Movable Bridge-Rehab, Limit Switches & Transducers Remove (44326915201) Ls 1.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents