Similar Projects
Springhill Suites by Marriott / San Antonio North
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
San Antonio, TX 78205

Burbank High School - 2020 Bond - Category 2 - San Antonio Independent School District (SAISD)
New Construction, Renovation, Infrastructure
Design
$19,318,760 CJ est. value
San Antonio, TX 78205

Fox Tech Campus - 2020 Bond - Category 2 - San Antonio Independent School District (SAISD)
New Construction
Design
$78,871,204 CJ est. value
San Antonio, TX 78205

Hill Country High School
New Construction, Infrastructure - 64,000 SF
Bidding
$22,000,000 CJ est. value
San Antonio, TX 78254

2018 Street Bond Projects - Phase II
Infrastructure
Post-Bid
$1,900,000 CJ est. value
Kirby, TX 78219

South Alamo Street (Market Street to Cesar Chavez Boulevard)
Infrastructure
Post-Bid
$22,880,631 CJ est. value
San Antonio, TX 78204

Thea Meadows Unit 4 Subdivision
Results
San Antonio, TX 78275

Paso Del Norte Street (Shady Oaks)
Infrastructure
Results
$1,579,900 est. value
San Antonio, TX 78232

Waters Edge I / Building A
New Construction, Infrastructure - 105,702 SF
Construction
$18,600,000 CJ est. value
San Antonio, TX 78235

Shaenfield Business Park
New Construction, Infrastructure - 44,000 SF
Construction
$4,400,000 CJ est. value
San Antonio, TX 78254

Nicha's Comida Mexicana
New Construction, Infrastructure - 7,805 SF
Pending Verification
$2,000,000 CJ est. value
San Antonio, TX 78214

Refuel / San Antonio
New Construction, Infrastructure - 4,769 SF
Pending Verification
$1,400,000 CJ est. value
San Antonio, TX 78254

SOFTBALL FIELD UPGRADE
Infrastructure
Design
$300,000 CJ est. value
San Antonio, TX 78224

Legacy Traditional Schools, Kelley Campus Tenant Improvement
Infrastructure, Renovation - 28,000 SF
Post-Bid
$2,500,000 CJ est. value
San Antonio, TX 78216

Morgan Meadows Units 2B, 3A & 3B and Morgan Heights - Phase 1B
Infrastructure
Results
San Antonio, TX 78275

Last Updated 12/13/2022 12:32 PM
Project Title

Greg A. Garcia Early College Intermediate School

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78224   (Bexar County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Site Development, Vocational School
Contracting Method Competitive Bids
Project Status Construction Commenced, Request for Qualifications, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $17,500,000 [brand] Estimate
Plans Available from Design-Build Firm
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 13, 2022 construction has commenced on August 18, 2022. *This project has been awarded and all trades have been let.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents