Similar Projects
Town Hall Building Renovation & Expansion
Renovation, Addition
Conception
$3,750,000 est. value
Norwell, MA

City Hall Exterior Envelope
Renovation
Conception
Framingham, MA

Town Hall & School Administration Building
New Construction
Design
Wilmington, MA

Town Hall Exterior Renovations
Renovation
Design
Easton, MA

RFQ Construction Management at Risk - Restoration and Renovation to the Historic Town Hall Project
Addition, Demolition, Renovation, Infrastructure
Bidding
$16,000,000 CJ est. value
Cohasset, MA 02025

RFQ Contractor - New Town Hall Project - GC
New Construction, Infrastructure
Bidding
$19,000,000 CJ est. value
Norton, MA 02766

New Bedford City Hall Elevator Modernization Project - Sub
Renovation
Sub-Bidding
$600,000 CJ est. value
New Bedford, MA 02740

RFQ Contracor - New Town Hall Building - Sub
New Construction, Infrastructure
Sub-Bidding
$19,000,000 CJ est. value
Taunton, MA 02780

Moakley CFM Sources Sought
Term Contract
Post-Bid
Boston, MA 02210

Renovation and Construction of New Multi-Use Courts
Renovation
Post-Bid
$120,000 est. value
Groton, MA 01450

District Court Holding Cells Renovations - General Bids
Renovation
Results
$425,000 est. value
Leominster, MA 01453

District Court Holding Cell Renovations - Filed Sub Bids
Renovation
Results
$425,000 est. value
Leominster, MA 01453

RFP - Owner's Project Manager (OPM) Services - Norton Town Hall Project and Norton Senior/community Support Center Project - Phase I and II
Demolition, New Construction, Infrastructure
Pending Verification
$34,000,000 CJ est. value
Norton, MA 02766

Boston Municipal Court South Boston Division - City of Boston
Renovation
Pending Verification
$1,000,000 CJ est. value
Boston, MA 02127

Old Town Hall Exterior Masonry and Balcony Restoration - FAC-6 - Town of Andover
Renovation
Conception
$250,000 est. value
Andover, MA 01810

Last Updated 11/11/2022 06:32 PM
Project Title

Pepperell Town Hall Second Floor Restoration

Physical Address View project details and contacts
City, State (County) Pepperell, MA 01463   (Middlesex County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $155,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor Qualification DCAMM Certificate This project is for the repair, replacement, and restoration of interior finishes. The work includes removal of and installation of ceilings, insulation, plaster repair, paint restoration, painting, door replacement, and flooring at the second floor (two story space) meeting space of the historic town hall with matching historic construction. A. Conditions of the Contract and Division 01, General Requirements, apply to work of this Section. Where paragraphs of this Section conflict with similar paragraphs of Division 01, requirements of this Section shall prevail. B. Examine Drawings and other Sections of Specifications for requirements that affect work of this Section. C. As used in this Section, "provide" means "furnish and install" and "HVAC" means "Heating, Ventilating, and Air Conditioning" and "POS" means "Provided Under Other Sections". "Furnish" means "to purchase and deliver to the project site complete with every necessary appurtenance and support," and "Install" means "to unload at the delivery point at the site and perform every operation necessary to establish secure mounting and correct operation and the proper location in the project." D. Perform work and provide material and equipment as shown on Drawings and as specified or indicated in this Section of the Specifications. Completely coordinate work of this Section with work of other trades and provide a complete and fully functional installation. Drawings and Specifications from complimentary requirements; provide work specified and not shown, and work shown and not specified as though explicitly required by both. Although work is not specifically shown or specified, provide supplementary or miscellaneous items, appurtenances, devices and materials obviously necessary for a sound, secure and complete installation. Remove all debris caused by Sub-Contractors' work. E. Drawings are diagrammatic and indicate general arrangement of systems and work included in Contract. It is not intended to specify or to show every offset, fitting or component; however, Contract Documents require components and materials whether or not indicated or specified as necessary to make the installation complete and operational. F. Perform work strictly as required by the rules, regulations, standards, codes, ordinances, and laws of local, state, and federal government, and other authorities that have lawful jurisdiction. G. Give notices, file plans, obtain permits and licenses, pay fees and obtain necessary approvals from authorities that have jurisdiction. H. As work progresses and for duration of Contract, maintain complete and separate set of prints of Contract Drawings at job site at all times. Record work completed and all changes from original Contract Drawings clearly and accurately, including work installed as a modification or addition to the original design.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents