Similar Projects
Police Station Remodel
Renovation
Bidding
Wauwatosa, WI 53226

Fire Station Remodeling (Phase II)
Renovation
Post-Bid
Fitchburg, WI 53711

First Station No. 4
Renovation, Addition
Post-Bid
Waukesha, WI 53188

911 Center Upgrades
Renovation
Results
Juneau, WI 53039

EMS - Building Repairs
Results
Sayner, WI 54560

Fire Station and EMS Facility
New Construction - 17,000 SF
Construction
$5,500,000 est. value
Rothschild, WI 54474

Fire Station and EMS Facility
New Construction - 17,000 SF
Construction
$5,500,000 est. value
Rothschild, WI 54474

Kenosha Fire Station 4
New Construction
Post-Bid
Kenosha, WI

Alteration to Baraboo Fire Department Building
Renovation
Results
Baraboo, WI 53913

Viroqua Police Department Renovation
Renovation
Results
Viroqua, WI 54665

Consolidated Fire Response Ranger Station - General
New Construction
Results
Less than $1,900,000 est. value
Gresham, WI

Fire Response Ranger Station Replacement - General
New Construction
Results
Less than $1,800,000 est. value
Anston, WI

Fire Response Ranger Station Replacement Black River Falls Station-General
New Construction
Results
Less than $2,100,000 est. value
Black River Falls, WI

Fire Department Dorm Room/Toilet Room
Renovation
Results
$51,000 est. value
Merton, WI 53056

Sauk Prairie Police Station
Results
$6,200,000 est. value
Prairie du Sac, WI 53578

Last Updated 11/23/2020 01:32 PM
Project Title

Design/Build Bathroom Remodel Project at East Side Fire Station (Station 2)

Physical Address View project details and contacts
City, State (County) Mequon, WI 53092   (Ozaukee County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To design and create one new unisex bathroom on the main level of the fire station which includes cutting in a new exterior door opening, and remodel two lower level existing bathrooms with one to include a shower at the East Side Fire Station.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents