Similar Projects
Solution to Repair and Sustain Cooling Tower Structures
Renovation
Conception
$300,000 CJ est. value
Chouteau, OK 74337

Nuisance Abatement
Term Contract, Demolition, Infrastructure
Design
$50,000 CJ est. value
Earlsboro, OK 74840

125 Acres of Selective Removal of Eastern Red Cedar at Canton WMA
Term Contract
Sub-Bidding
Longdale, OK 73755

Abatement Services 2022
Term Contract
Post-Bid
Woodward, OK

Multi-Year Blanket - Non-Emergency Environmental Services
Term Contract
Post-Bid
Vinita, OK

Nuisance Abatement
Alteration
Results
Lawton, OK

Optima Asbestos Abatement
Alteration
Results
$25,000 est. value
Hardesty, OK

Asbestos Abatement and/or Demolition of Glancy Motel and Former Pop Hicks Restaurant
Demolition, Alteration
Post-Bid
$40,000 est. value
Clinton, OK 73601

Demolition Old Edmond Res-Maintenance Yard - Central Sign Shop
Demolition, Infrastructure
Results
$47,300 CJ est. value
Edmond, OK 73013

Nuisance Abatement
Term Contract, Infrastructure
Post-Bid
$150,000 CJ est. value
Lawton, OK 73501

Northeastern State University Lawn Sign
Infrastructure
Results
$184,481 CJ est. value
Tahlequah, OK 74464

Gage 2022-23 Island Repair
Infrastructure
Post-Bid
$200,000 CJ est. value
Gage, OK 73843

Purchase and Remove House at 2218 West 6th Avenue
Demolition, Infrastructure
Results
$3,000 CJ est. value
Stillwater, OK 74074

Demolition and Removal of a Condemned House
Demolition, Infrastructure
Post-Bid
$50,000 CJ est. value
Broken Bow, OK 74728

Residence Demolition - 1825 Military Drive
Demolition, Infrastructure
Results
$20,000 CJ est. value
Claremore, OK 74017

Last Updated 04/14/2023 05:33 PM
Project Title

Asbestos Abatement

Physical Address View project details and contacts
City, State (County) Alva, OK 73717   (Woods County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Woods County Courthouse anticipates a project to remove asbestos from several areas within the courthouse building associated with the supply and return lines from the abandoned boiler system, domestic water supply and HVAC duct insulation. This work will require the removal to be completed in several phases with minimal disruption to the building occupants. Basement Boiler Room: All HVAC duct work, boiler insulation and water line insulation will be removed from this area. Estimated amounts are 304 square foot of boiler material, approximately 360 linear feet of pipe insulation and approximately 580 asbestos duct tape. Basement Storage Area: All the pipe insulation in this area is to be removed. Any HVAC duct insulation will remain in place. There is an estimated 11 72 linear feet of material in this area. First Floor: Abatement of this floor will include removal of all domestic water pipe insulation (-756 linear feet), remove approximately 100 linear feet of steam line insulation and 160 linear feet of HVAC duct insulation. Second Floor: Removal of-70 linear feet of pipe TSI from various areas on this floor. Third Floor: Approximately 60 linear feet of TSI from this area. Note: This area serves as the county jail facility. The county will need to displace the prisoners during all abatement activities. Therefore, the abatement in this area will need to be completed as quickly as possible.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents