Similar Projects
Last Updated | 10/28/2021 09:00 AM |
Project Title | Add Left Turn Lane(s), Traffic Signals and Lighting- SR 684 |
Physical Address | View project details and contacts |
City, State (County) | FL (Manatee County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Traffic Signalization |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $388,634 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 0001 Roadway 0101- 1- Mobilization (44068815201) Ls 1.000 0102- 1- Maintenance Of Traffic (44068815201) Ls 1.000 0102- 60- Work Zone Sign Ed 7,120.000 0102- 74- 1 Channelizing Device- Types i, Ii, Di, Vp, Drum, Or Lcd Ed 4,960.000 0102- 74- 8 Channelizing Device- Pedestrian Lcd (Longitudinal Channelizing Device) Fd 2,350.000 0102- 76- Arrow Board / Advance Warning Arrow Panel Ed 80.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 188.000 0102-104- Temporary Signalization And Maintenance, Intersection Ed 80.000 0102-107- 1 Temporary Traffic Detection And Maintenance, Intersection Ed 80.000 0104- 18- Inlet Protection System Ea 7.000 0107- 1- Litter Removal Ac 1.250 0107- 2- Mowing Ac 0.460 0110- 1- 1 Clearing & Grubbing (44068815201) Ls 1.000 0110- 4- 10 Removal Of Existing Concrete Sy 185.000 0120- 1- Regular Excavation Cy 97.400 0120- 6- Embankment Cy 31.600 0160- 4- Type b Stabilization Sy 346.000 0285-709- Optional Base, Base Group 09 Sy 229.000 0327- 70- 6 Milling Existing Asphalt Pavement, 1 1/2" Avg Depth Sy 99.000 0334- 1- 53 Superpave Asphaltic Concrete, Traffic c, Pg76-22 Tn 18.900 0337- 7- 83 Asphalt Concrete Friction Course,Traffic c, Fc-12.5, Pg 76- 22 Tn 27.000 0520- 1- 7 Concrete Curb & Gutter, Type e Lf 409.000 0520- 1- 10 Concrete Curb & Gutter, Type f Lf 12.000 0522- 1- Concrete Sidewalk And Driveways, 4" Thick Sy 36.000 0522- 2- Concrete Sidewalk And Driveways, 6" Thick Sy 7.000 0527- 2- Detectable Warnings Sf 55.000 0570- 1- 2 Performance Turf, Sod Sy 320.000 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 7.000 0635- 2- 11 Pull & Splice Box, f&i, 13" x 24" Cover Size Ea 1.000 0715- 1- 12 Lighting Conductors, f&i, Insulated, No.8 - 6 Lf 35.000 0715- 4- 60 Light Pole Complete, Relocate Ea 1.000 0999- 25- Initial Contingency Amount, Do Not Bid (44068815201) Ls 1.000 Section 0002 Signing 0700- 1- 11 Single Post Sign, f&i Ground Mount, Up To 12 Sf As 8.000 0700- 1- 12 Single Post Sign, f&i Ground Mount, 12-20 Sf As 6.000 0700- 1- 13 Single Post Sign, f&i Ground Mount, 21-30 Sf As 2.000 0704- 1- 1 Tubular Marker, Durable, 36" White Post Ea 1.000 0706- 1- 3 Raised Pavement Marker, Type b Ea 93.000 0710- 11-290 Painted Pavement Markings, Standard, Yellow, Island Nose Sf 15.000 0710- 90- Painted Pavement Markings, Final Surface (44068815201) Ls 1.000 0711- 11-170 Thermoplastic, Standard, White, Arrow Ea 5.000 0711- 16-101 Thermoplastic, Standard-Other Surfaces, White, Solid, 6" Gm 0.019 0711- 16-201 Thermoplastic, Standard-Other Surfaces, Yellow, Solid, 6" Gm 0.073 Section 0003 Signalization 0611- 1- 1 Itsfm Subsurface Documentation- Project Length Mi 2.481 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 48.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 1,527.000 0632- 7- 1 Signal Cable- New Or Reconstructed Intersection, Furnish & Install Pi 1.000 0632- 7- 6 Signal Cable, Remove- Intersection Pi 1.000 0633- 1-420 Fiber Optic Cable, Relocate, Underground Lf 1,182.000 0633- 2- 31 Fiber Optic Connection, Install, Splice Ea 74.000 0633- 3- 11 Fiber Optic Connection Hardware, f&i, Splice Enclosure Ea 1.000 0635- 2- 11 Pull & Splice Box, f&i, 13" x 24" Cover Size Ea 19.000 0643-600- Strain Pole, Wood, Remove Ea 2.000 0646- 1- 11 Aluminum Signals Pole, Pedestal Ea 3.000 0649- 21- 3 Steel Mast Arm Assembly, Furnish And Install, Single Arm 40' Ea 1.000 0649- 21- 6 Steel Mast Arm Assembly, Furnish And Install, Single Arm 50' Ea 1.000 0649- 26- 1 Steel Mast Arm Assembly, Remove, Pole Only- Entire Foundation Remains Ea 2.000 0650- 1- 14 Vehicular Traffic Signal, Furnish & Install Aluminum, 3 Section, 1 Way As 6.000 0653- 1- 12 Pedestrian Signal, Furnish & Install Led Countdown, 2 Ways As 3.000 0653- 1- 60 Pedestrian Signal, Remove Ped Signal- Pole/Pedestal To Remain As 2.000 0660- 3- 11 Vehicle Detection System- Microwave, Furnish & Install Cabinet Equipment Ea 1.000 0660- 3- 12 Vehicle Detection System- Microwave, Furnish & Install, Above Ground Equipment Ea 6.000 0665- 1- 11 Pedestrian Detector, Furnish & Install, Standard Ea 6.000 0670- 5-400 Traffic Controller Assembly, Modify As 1.000 0700- 5- 22 Internally Illuminated Sign, Furnish & Install, Overhead Mount, 12-18 Sf Ea 2.000 |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |