Similar Projects
Water Main Relocation and Early Grading
Infrastructure
Results
Bellingham, WA

Post Point Sludge Pump System Replacement
Renovation, Addition
Results
$1,100,000 to $1,500,000 est. value
Bellingham, WA 98225

Station 81 Site Preparation
Infrastructure
Post-Bid
Everson, WA 98247

Site and Utility Improvements - Kwina Apartments, Phase 3
Infrastructure
Results
Bellingham, WA 98226

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Swift Creek Action Plan 2022 Construction
Term Contract
Post-Bid
$1,400,000 to $1,800,000 est. value
Bellingham, Everson, WA 98247

RFQ D/B - I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Kwina Road WWTP MBR System Improvements
Renovation
Design
$50,000 CJ est. value
Bellingham, WA 98225

Birnam Wood Siding and Bridges Phase 1
Infrastructure, Renovation
Post-Bid
$3,860,000 CJ est. value
Bellingham, WA 98225

SR 542/Squalicum Creek to Bellingham Bay - Fish Passage
Infrastructure
Design
$3,633,000 CJ est. value
Deming, WA 98244

I-5/Squalicum Creek to SR 539 - Bridge Deck Overlays
Infrastructure, Renovation
Design
$825,000 CJ est. value
Bellingham, WA 98229

I-5/Slater Road Interchange - Improvements
Infrastructure
Design
$13,661,000 CJ est. value
Bellingham, WA 98229

Thornton Street, Vista Drive to Malloy Avenue Project
Infrastructure
Bidding
$4,750,000 CJ est. value
Ferndale, WA 98248

South College Drive
Infrastructure
Bidding
$930,000 CJ est. value
Bellingham, WA 98225

I-5/SB Joe Leary Slough to Nulle Rd Vic - Concrete Rehabilitation
Infrastructure
Design
$12,127,000 CJ est. value
Ferndale, WA 98248

Last Updated 09/21/2022 12:05 AM
Project Title

RFP General Contractor/Construction Manager Services - General Contractor/Construction Manager for Post Point Recovery Project

Physical Address View project details and contacts
City, State (County) Bellingham, WA 98225   (Whatcom County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected January 2023 , Request For Proposals, Construction documents
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

** Per Addendum #3, this project has been cancelled. For more information please contact City of Bellingham. ** General Contractor/Construction Management (GC/CM) companies (Respondents) are invited to submit Statement of Qualifications (SOQ) for the preconstruction services and potential construction services for the Post Point Resource Recovery Plant Project (Project) EU189 in accordance with the Heavy Civil Construction process of the Revised Code of Washington Question Deadline 09/09/2022 at 4:00 PM PT The Project involves the replacement of the City of Bellingham's (Owner's) Post Point Resource Recovery incineration process. The incinerators will be replaced with an anaerobic digestion system to produce Class A biosolids product. The anaerobic digestion process will also produce biogas, which is planned for injection in the local natural gas pipeline as a renewable fuel. The Project also includes ancillary upgrades to the solids thickening and dewatering processes, solids screening, digester biogas treatment, and electrical and instrumentation system, and includes a "side stream" treatment process to remove nitrogen. A new Resource Recovery Center is included to replace aging and inadequate facilities, including operations center, environmental education, laboratory, and maintenance facilities. Pursuant to RCW 39.10, Alternative Public Works Contracting Procedures, the Owner intends to award a contract for GC/CM services utilizing a two-step competitive process to select the most qualified contractor.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents