Similar Projects
FY 2019 CDBG Sidewalk Ramp Improvements
Bidding
Less than $36,785 est. value
Clawson, MI

Colfax CDBG Sidewalk Construction
Bidding
Farmington Hills, MI

Rest Areas and Welcome Centers Across the State
Term Contract
Post-Bid

Seal Coating PD and Town Hall Parking Lot
Post-Bid
West Bloomfield, MI

Fisk Farm Sidewalk Extension
Results
Less than $95,500 est. value
White Lake, MI

Glen Oaks Parking Lot
Results
Less than $607,395 est. value
Pontiac, MI

2020-2021 Concrete Maintenance
Bidding
Auburn Hills, MI

Civic Center Park - Wildwood Pathway
Post-Bid
Lake Orion, MI

Fire Station 2 Pavement Rehabilitation and Fire Station 3 Pavement Rehabilitation
Results
Less than $81,718 est. value
White Lake, MI

Civic Center Drive Reconstruction
Bidding
Less than $322,000 est. value
Waterford, MI 48329

2019 Sidewalk Repair Program (SAD 2019)
Post-Bid
Ferndale, MI

Brewster Elementary Parking Lot 2019
Results
Less than $228,790 est. value
Rochester Hills, MI

Repairs to Parking areas at the Salem-South Lyon District Library.
Post-Bid
South Lyon, MI 48178

2019 Sidewalk Project
Results
Ortonville, MI

Fire Station Accessibility Improvements
Post-Bid
Walled Lake, MI 48390

Reported 03/05/2019 12:00 AM
Project Title

Township Hall Parking Lot Reconstruction

Physical Address View project details and contacts
City, State (County) Clarkston, MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description Division No. 1 New Sidewalk North of Township Hall Parking Area: Work for this division consists of installation of approximately 450 square yards of new concrete sidewalk north of Township Hall. The new walk connects to the existing north building entrance. Division No. 2 South Access Drive Paving: Work for this division consists of pulverizing and compacting the existing pavement and base material to 16" depth along the southerly access drive from Waldon Center Drive to the existing dumpster located in the southwest corner of the parking lot. Saw cutting the existing drive approaches will be required. The proposed work includes installing approximately 650 square yards of new six inch (6") deep strength HMA pavement, a new eight inch (8") thick concrete dumpster pad, and partial and full depth base repairs as needed. Division No. 3 Township Hall Parking Lot: Work for this division consists of pulverizing and compacting the existing parking lot pavement and base material to 12" depth (approximately 3,900 square yards), installing approximately 3,900 square yards of new 4" asphalt pavement, installing approximately 330 square yards of concrete walk, miscellaneous curb removal and replacement, partial and full depth base repairs as needed, 12" storm sewer, edge drain, new sidewalks and ADA ramps, brick paver removal and replacement, restoration and miscellaneous bid items as specified in project documents.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents