Similar Projects
RFP D/B - Design/Build Services for HVAC Automation Control Upgrades
Renovation
Bidding
$3,685,500 CJ est. value
Stone Mountain, GA 30083

AC for Poplar Springs Gym Rebid
Renovation
Sub-Bidding
$160,351 CJ est. value
Ringgold, GA 30736

Cooling Tower Replacement - Building B Marietta Campus
Renovation
Sub-Bidding
$300,000 CJ est. value
Marietta, GA 30060

Selective Improvements at Four Developments
Alteration
Post-Bid
$350,000 est. value
Metter, GA

HVAC Maintenance
Alteration
Post-Bid
Metter, GA 30439

Newnan Campus TERV Replacement
Alteration
Results
$318,427 est. value
Newnan, GA 30263

Variable Speed Drive-Rotary Screw Air Compressor
Alteration
Results
Decatur, GA 30034

Annual Contract for Quarterly HVAC Maintenance at the Chatham County Legislative Courthouse
Term Contract
Sub-Bidding
Savannah, GA 31406

Annual Contract for HVAC Repair, Service, and Planned Maintenance for Various Equipment
Term Contract
Post-Bid
GA

Courthouse HVAC
Alteration
Results
Ringgold, GA 30736

HVAC Revitalization
Renovation
Sub-Bidding
$80,000 CJ est. value
Douglasville, GA 30135

Annual Contract for HVAC Repair, Service, and Planned Maintenance for Trane Equipment
Alteration
Post-Bid
GA

HVAC Replacement
Infrastructure
Results
Cumming, GA 30040

HVAC Maintenance Services
Term Contract
Sub-Bidding
Powder Springs, GA 30127

HVAC Renovations to Pepperell Elementary School
Alteration
Post-Bid
$2,150,000 est. value
Lindale, GA 30147

Last Updated 01/25/2023 03:01 PM
Project Title

Camden Center Chiller CHR-1 Replacement

Physical Address View project details and contacts
City, State (County) Kingsland, GA 31548   (Camden County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $384,500 [brand] Estimate
Plans Available from Mechanical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract, if awarded, will be on a lump sum basis. No bid may be withdrawn for a period of thirty-five days after time has been called on the date of opening except in accordance with the provisions of Georgia law. Bids must be accompanied by a Bid Bond made payable to the Owner in an amount equal to not less than five percent of the Bid. Both a performance bond and a payment bond will be required, each in an amount equal to 100 percent of the Contract Sum prior to execution of contract. The Owner reserves the right in its sole and complete discretion to waive technicalities and informalities. The Owner further reserves the rights in its sole and complete discretion to reject all bids and any bid that is not responsive or that is over the budget. In the event all responsive and responsible bids are in excess of the budget, the Owner, in its sole and absolute discretion and in addition to rejecting all bids, reserves the right either to supplement the budget or to negotiate with the lowest responsive and responsible bidder (after all deductive alternates are taken) but only for the purpose of making changes to the project that will result in a cost to the Owner that is within the budget, as it may be supplemented.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents