Similar Projects
Brentwood Boulevard Widening North - Phase 1 - 336-31620
Infrastructure
Conception
$7,050,340 est. value
Brentwood, CA 94513

Downtown Alley Rehabilitation - Mid Way - City Of Brentwood
Alteration
Conception
$2,100,000 est. value
Brentwood, CA 94513

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Primrose School - Orchards Shopping Center / Walnut Creek
New Construction, Infrastructure - 12,838 SF
Design
$2,800,000 CJ est. value
Walnut Creek, CA 94598

Remove PCC and AC, Place PCP and AC Resurfacing
Infrastructure
Bidding
$60,000,000 CJ est. value
Blackhawk, CA 94506

Remove PCC and AC, Place PCP and AC Resurfacing
Infrastructure
Bidding
$60,000,000 CJ est. value
Blackhawk, CA 94506

Remove and Install Guardrails and Construct Concrete Barriers
Infrastructure
Sub-Bidding
$12,200,000 CJ est. value
Brentwood, CA 94513

Remove and Install Guardrails and Construct Concrete Barriers
Infrastructure
Sub-Bidding
$12,200,000 CJ est. value
Brentwood, CA 94513

Parking Lot Sweeping and Pressure Washing and/or Steam Cleaning Services at the Concord DMV Field Office
Term Contract
Post-Bid
Concord, CA 94520

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Paving Repairs and Ramps at FHFB
Term Contract
Results
Richmond, CA

Parking Lot Repairs and Seal and Stripe Services at the Concord Department of Motor Vehicles Field Office
Term Contract
Results
Concord, CA 94520

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Solid Waste Organics Diversion - City of Brentwood
Infrastructure
Conception
$30,000,000 est. value
Brentwood, CA 94513

Last Updated 01/17/2023 08:31 AM
Project Title

CDBG Downtown Roadway Pavement Rehabilitation, Phase 9

Physical Address View project details and contacts
City, State (County) Antioch, CA 94509   (Contra Costa County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $685,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of roadway recontruction, cold planing existing roadway sections and installing asphalt concrete roadway overlays. Additional work shall be include, But not be limited to constructing concrete curb, gutter, site work, valley gutter and curb ramps, removing and relocating existing facilities, tree removal, adjusting utilities to grade, placing pavement markings and markers, traffic control, and water pollution control. The city of antioch reserves the right to reject any and all bids. The estimated cost of construction is $850,000.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents