Similar Projects
Mount Peace Cemetery Expansion
Alteration
Conception
Akron, OH 44303

Hudson Greenway Trail - State of Ohio
Infrastructure, Alteration
Conception
$750,000 est. value
Hudson, OH 44236

Wyoga Lake Road Infrastructure & Apartment Building
New Construction - 2,000 SF
Design
Cuyahoga Falls, Stow, OH 44224

Girl Scouts STEM Center for Excellence / Peninsula
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Peninsula, OH 44264

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

SR 134 - Culvert Replacement
Infrastructure
Bidding
$641,000 CJ est. value
Lynchburg, OH 45142

Corporate Woods Circle/Boettler Road
Infrastructure
Post-Bid
$6,077,914 est. value
Green, OH 44685

Kent State University Airport Runway Design Study
Infrastructure
Post-Bid
$160,000 CJ est. value
Stow, OH 44224

Four Lane Resurfacing - /SUM-IR 480/SR 91-29.69/19.07
Infrastructure
Results

Chip Seal- D10-Chip Seal FY2022 North
Infrastructure
Results

White Pond Drive Mixed Use
New Construction, Infrastructure - 51,720 SF
Pending Verification
$55,000,000 CJ est. value
Akron, OH 44313

Sgt Clean Car Wash / Fairlawn
Demolition, New Construction, Infrastructure - 5,600 SF
Pending Verification
$5,000,000 CJ est. value
Fairlawn, OH 44333

Akron Zoo - State of Ohio
Infrastructure
Conception
Akron, OH 44307

Roadway Minor Rehab - IR 77
Infrastructure
Design
$2,080,000 CJ est. value
Akron, OH 44320

Minor Reconstruction
Infrastructure
Bidding
$3,439,152 CJ est. value
Barberton, OH 44203

Last Updated 02/13/2023 10:17 AM
Project Title

Driftwood / Cherrywood Reconstruction

Physical Address View project details and contacts
City, State (County) Norton, OH 44203   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing the labor and material required for the City of Nortons Driftwood/Cherrywood Reconstruction project according to the plans, specifications, and estimates for such improvement. Each bidder is required to furnish with its proposal, a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security furnished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. Bidders must comply with the prevailing wage rates on Public Improvements in Summit County and the City of Norton, Ohio as determined by the Ohio Department of Commerce, Bureau of Wage and Hour Administration, 614.644.2239. No bidder shall be considered a competent and responsible bidder or eligible to be awarded the contract to which this Notice applies, if the bidder is listed on the Auditor of States database as having a Finding of Recovery as that term is defined in O.R.C. 9.24. The City of Norton reserves the right to reject any or all bids and to waive any formalities or irregularities in bidding.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents