Similar Projects
Town of Columbus, Old STH 73 Rd - Construct OPS / Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Columbus, WI 53925

Town of Columbus, Old STH 73 Rd - Construct OPS / Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Columbus, WI 53925

Business Park Road Manufacturing Development / Wisconsin Dells
Addition, Demolition, Infrastructure - 9,600 SF
Design
$1,036,800 CJ est. value
Wisconsin Dells, WI 53965

T. Arlington, Smokey Hollow Road, Meek Road to CTH K
Infrastructure
Bidding
$500,000 CJ est. value
Lodi, WI 53555

T. Arlington, Smokey Hollow Road, Meek Road to CTH K
Infrastructure
Bidding
$500,000 CJ est. value
Lodi, WI 53555

Columbia County Road Improvements
Renovation
Post-Bid
Columbus, WI

2021 Messer Road Repair
Infrastructure
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Geogrid Asphalt Pavement Design Alternatives
Results
Portage, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

STH 146 - STH 73 - Const Ops/ Bridge Reconstruction
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Poynette, WI 53955

2021 Concrete Sidewalk Replacement Program
Infrastructure
Post-Bid
Columbus, WI

Polymer Overlay for Bridge Decks
Results
Portage, WI

Stony Acres Building #2
New Construction, Infrastructure
Construction
$28,000,000 CJ est. value
Wisconsin Dells, WI 53965

Last Updated 10/17/2022 01:36 PM
Project Title

Village of Lake Delton WI - 2022 Streets Project

Physical Address View project details and contacts
City, State (County) Wisc Dells, WI 53965   (Columbia County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes the following: Reconstruction of Burritt Avenue - Urban section road reconstruction to include two (2) travel lanes and adjacent bike lanes, and sidewalk on one side of the roadway. A compact concrete roundabout is also proposed for the intersection of Xanadu Road and Burritt Ave. o Reconstruction of Bayer Lane - Rural section roadway to include two (2) travel lanes and center concrete flume o Work items to support the street reconstructions include: - Clearing and Grubbing - Unclassified Excavation - Traffic Control - Erosion Control - Minor Sanitary Sewer and Water Main Adjustments - Sanitary Sewer - Storm Sewer - Asphalt Pavement and Base Course - Concrete Sidewalk - Concrete Curb and Gutter - Chain Link Fencing - Pavement Markings and Signage - Turf/Site Restoration The anticipated substantial completion date is June 30, 2023 and final completion date is July 21, 2023. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. 1230 South Boulevard, Baraboo, WI 53913The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. The project in the Village of Lake Delton is funded in part by the Wisconsin Department of Transportation Local Road Improvement Program (LRIP) to include funding from LRIP and the MSID funds. OWNER reserves the right to waive any informalities or to reject any or all bids.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents