Similar Projects
Last Updated | 05/12/2023 11:09 AM |
Project Title | Margaret Street Fire Pump Building Key West Historic Seaport |
Physical Address | View project details and contacts |
City, State (County) | Key West Naval Air Station, FL 33040 (Monroe County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dock/Pier/Marine, Site Development |
Contracting Method | Competitive Bids |
Project Status | All Bids Rejected, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $965,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of May 11, 2022 all bids were rejected. At this time, the project is not expected to be rebid. The project consists of the removal of the existing non-historic fire pump house in the middle of margaret street plaza and the construction of a new fire pump house in a more appropriate location near the caroline street parking lot. The fire pump house supplies pressure to the fire suppression lines on the docks at the historic seaport. In addition to the construction of the new fire pump house, the scope also includes electrical service to the building both 3 phase and single phase from an existing transformer. Contractor to include new underground fire lines and water connections. Revised landscaping around the structure and paver replacement per plan will be required in the plaza as well. Bid Bond 5% Plan (blueprint) Electronic plan documents |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |