Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

CHRL Pump Station 1A, 2 and 3
Infrastructure
Design
$630,000 est. value
WA

North East 6th Street Water Main Replacement
Infrastructure
Bidding
$1,600,000 to $1,650,000 est. value
North Bend, WA 98045

SR900 PRV Improvements Project
Infrastructure
Bidding
$450,000 est. value
Issaquah, WA 98027

Tapteal 1 Pump Station Upgrade
Infrastructure
Post-Bid
Richland, WA 99352

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Water Station 5 Reservoirs and Pump Station
Infrastructure
Results
$28,250,000 est. value
Vancouver, WA 98687

Water Meter Changeout
Infrastructure
Results
WA

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA 99218

Installation of a 40HP Submersible Pump and Motor
Infrastructure
Bidding
Winthrop, WA

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Palouse Water Main Replacement
Term Contract
Bidding
Palouse, WA

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

Reported 03/16/2022 12:08 AM
Project Title

Water Facilities Improvements

Physical Address View project details and contacts
City, State (County) Brewster, WA   (Okanogan County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,300,000 to $1,500,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Construction of the Canyon Well House No. 2, including site work, piping, pump and all appurtenances. The project also includes the construction of approximately 1,350 LF of 12-inch transmission main.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents