Similar Projects
Oil Pure Purification System Falcon Power Plant
Term Contract
Bidding
Falcon Heights, TX 78545

Install Water Draw-Off System
Post-Bid
Corpus Christi, TX

Fuel Storage Tank Replacement
Post-Bid
Less than $250,000 est. value
Pearland, TX 77581

Aviation Fuel for Jack Brooks Regional Airport
Term Contract
Results
Less than $874,201 est. value
Taylor, TX 77705

High Pressure Gas Main Replacement
Results
Less than $7,800,000 est. value
Port Aransas, TX 78373

Fleet Facility Fuel
Term Contract
Post-Bid
Galveston, TX 77554

Spill Prevention, Control and Countermeasure (SPCC) for Oil Piping
Results
$476,071 est. value
Dallas, TX 75261

Atmos Energy Gas Line Extension Project
Post-Bid
Forney, TX

Lease and Development of Fuel Station
Results
Conroe, TX 77301

Fuel Site Repairs and Service at Automotive Service Center Locations
Term Contract
Post-Bid
TX

Aviation Fuel Farm Storage Tank
Results
McKinney, TX 75069

Fuel Tank at Fire Station 4
Post-Bid
Irving, TX 75062

Annual Contract for Tank Cleaning and Fuel Circulation Services
Term Contract
Results
San Antonio, TX 78283

Preventive Maintenance Repairs for Fuel Pumps Throughout the Waco District
Post-Bid

Asphalt Tank Replacement
Results
Less than $128,123 est. value
Bryan, TX 77803

Reported 04/08/2022 12:00 AM
Project Title

Petroleum Storage Tank Site Activities

Physical Address View project details and contacts
City, State (County) Austin, TX   (Travis County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

TCEQ intends to enter into multiple-regional contracts for providing risk-based corrective action activities at petroleum storage tank (PST) sites under the PST State Lead Program. Under these contracts, the Remediation Division issues work orders for risk-based site assessment, non-engineered corrective action, and oversight services to conduct remedial actions at Leaking Petroleum Storage Tank (LPST) sites in Texas where petroleum products are the cause of soil, groundwater, and/or surface water contamination. HUB Goal 26%.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents