Last Updated | 12/12/2019 07:51 AM |
Project Title | Wastewater Collection System Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Fremont, NC 27830 (Wayne County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Eureka No. One Pump Station: Replacement of existing pumps, control panel, valves, belts, shives, and floats within an existing Gorman-Rupp 6x6 pump station and by-pass pumping. Provide and install a new generator, automatic transfer switch, and stainless-steel hood to cover electrical panels. Clean existing wet-well and install a new polymeric liner. Provide and install new 1-inch diameter water service with yard hydrant RPZ backflow preventer and meter. Provide and install the associated conduit, wiring, new auto dialer, and panels. Eureka No. Two Pump Station: Replacement of existing pumps, control panel, valves, belts, shives, and floats within an existing Gorman-Rupp 6x6 pump station. Provide and install a new generator, automatic transfer switch, and stainless-steel hood to cover electrical panels. Provide and install new 1-inch diameter water service with yard hydrant RPZ backflow preventer and meter. Provide and install the associated conduit, wiring, new auto dialer, and panels. Goldsboro No. One Pump Station: Replacement of existing pumps, control panel valves, belts, shives, and floats within an existing Gorman-Rupp 7x1O pump station. Provide and install a new generator, automatic transfer switch, and stainless-steel hood to cover electrical panels. Provide and install new L-inch diameter water service with yard hydrant RPZ backflow preventer and meter. Provide and install the associated conduit, wiring, new auto dialer, and panels. Fremont No. Two Pump Station: Installation of a new 4-inch diameter by-pass connection and by-pass pumping during construction. Demolition of the existing wet-well top slab, valve vault, pumps valves, and electrical panels. Provide a new pre-cast concrete valve box, pumps, valves, fittings, floats, piping, new cast-in-place concrete top with cast-in-place aluminum hatches. Provide new stainless-steel electrical mounting hood with new pump control panel, sub-panel, manual transfer switch, generator connection, associated conduit, wiring, auto-dialer, and panels. Provide and install new I-inch diameter water service with yard hydrant RPZ backflow preventer and meter. Fremont No. Four Pump Station: Installation of a new 4-inch diameter by-pass connection and by-pass pumping during construction. Demolition of the existing wet-well top slab, valve vault, pumps valves, and electrical panels. Provide a new pre-cast concrete valve box, pumps, valves, fittings, floats, piping, new cast-in-place concrete top with cast-in-place aluminum hatches. Provide new stainless-steel electrical mounting hood with new pump control panel, sub-panel, manual transfer switch, generator connection, associated conduit, wiring, auto-dialer, and panels. Provide and install new l-inch diameter water service with yard hydrant RPZ backflow preventer and meter. Fremont No. Five Pump Station: Installation of a new 4-inch diameter by-pass connection and by-pass pumping during construction. Demolition of the existing wet-well top slab, valve vault, existing G-R 6x6 station, pumps valves and electrical panels. Provide a new pre- cast concrete valve box, pumps, valves, fittings, floats, piping, new cast-in-place concrete top with cast-in-place aluminum hatches. Provide new stainless-steel electrical mounting hood with new pump control panel, sub-panel, manual transfer switch, generator connection, associated conduit, wiring, auto-dialer, and panels. Provide and install new l- inch diameter water service with yard hydrant RPZ backflow preventer and meter. Fremont No. Six Pump Station: Installation of a new 4-inch diameter by-pass connection and by-pass pumping during construction. Demolition of the existing wet-well top slab, valve vault, pumps valves, and electrical panels. Provide a new pre-cast concrete valve box, pumps, valves, fittings, floats, piping, new cast-in-place concrete top with cast-in-place aluminum hatches. Provide new stainless-steel electrical mounting hood with new pump control panel, sub-panel, manual transfer switch, generator connection, associated conduit, wiring, auto-dialer, and panels. Provide and install new l-inch diameter water service with yard hydrant RPZ backflow preventer and meter. Fremont No. Seven Pump Station: Installation of a new 4-inch diameter by-pass connection and by-pass pumping during construction. Demolition of the existing wet-well top slab, valve vault, pumps valves, and electrical panels. Provide a new pre-cast concrete valve box, pumps, valves, fittings, floats, piping, new cast-in-place concrete top with cast-in-place aluminum hatches. Provide new stainless-steel electrical mounting hood with new pump control panel, sub-panel, manual transfer switch, generator connection, associated conduit, wiring, auto-dialer, and panels. Provide and install new l-inch diameter water service with yard hydrant RPZ backflow preventer and meter. Goldsboro No.2 Pump Station: Installation of a new 4-inch diameter by-pass connection and by-pass pumping during construction. Provide new stainless-steel electrical mounting hood relocate existing pump control panel, sub-panels, auto transfer switch, associated conduit, wiring, auto-dialer, and panels. Provide and install new l-inch diameter water service with yard hydrant RPZ backflow preventer and meter. Gravity Sanitary Sewer Rehabilitation: CCTV Inspection of approximately 820-LF of 8-inch sanitary sewer and 27 manholes. Point repair and/or replacement of 8-inch gravity sewer pipe, 820-LF of Cured-in-Place Pipe (CIPP) lining of 8-inch gravity sanitary sewer, as determined by the CCTV Inspection. Robotic reconnection of approximately 119 4-inch diameter sanitary sewer services, 175 VF of 4-feet diameter manhole rehabilitation, magnetic flow meter replacement at discharge to Goldsboro. Gravity Sanitary Sewer Rehabilitation (Additional-Alternate): CCTV Inspection of additional 8-inch sanitary sewer pipes and manholes. Additional point repairs and/or replacement of 8-inch gravity sewer pipes, Additional Cured-in-Place Pipe (CIPP) lining of 8- inch gravity sanitary sewer, as determined by the CCTV Inspection. Robotic reconnection of 4-inch diameter sanitary sewer services, additional 4-feet diameter manhole rehabilitation. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |