Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Generator Maintenance Services
Term Contract
Post-Bid
Alexandria, VA

Pinecroft Apartments Electrical Services
Alteration
Post-Bid
Newport News, VA 23606

Y1NZ--Replace Building Transformers
Results
$2,000,000 to $5,000,000 est. value
Salem, VA 24153

Generator Installation - Murray High School and Jouett Middle School
Results
$200,000 to $284,000 est. value
Charlottesville, VA 22903

COE Nitrogen Generator
Alteration
Results
Richmond, VA 23220

Installation of Solar Photovoltaic Energy System
Alteration
Results
Farmville, VA 23901

Portable Light Towers for COVB Police Department
Alteration
Results
Virginia Beach, VA

East End Pump Station Generator Replacement
Alteration
Results
Less than $284,200 est. value
Purcellville, VA

Acuity nLight Network Lighting Controls
Term Contract
Results
Newport News, VA 23606

Last Updated 03/24/2022 03:46 PM
Project Title

USCGC Bear Fan Rebuild

Physical Address View project details and contacts
City, State (County) Portsmouth, VA 23703   (Portsmouth City County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall Overhaul AC electrical motor IAW SFLC Std. Spec. 3020. Specifically: re-wind motor, re-condition, install new bearings, and balance. Contractor shall Disassemble, clean and inspect, Perform electrical tests and check mechanical fits, Check stator core laminations, Rewind stator and varnish treat windings Clean and oven bake rotor. Contractor shall furnish and install new: New bearings (2ea Standard Ball bearings). Contractor shall dynamically balance the rotor and blower wheel, Assemble, test and paint, Crate fan according mil-spec packing. Contractor shall ensure all work is completed in accordance with the attached statement of work (SOW).

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents