Similar Projects
Smithville Road Culvert Replacement - BR-2017-009H - County of Peoria
Infrastructure
Conception
$300,000 CJ est. value
Mapleton, IL 61547

Voorhees Road Bridge Replacement - BR-2018-009H - County of Peoria
Demolition, New Construction, Infrastructure
Conception
$300,000 CJ est. value
Edwards, IL 61528

New Restroom and Site Work W. H. Sommer Park
New Construction, Infrastructure
Design
$251,000 CJ est. value
Edwards, IL 61528

Maxwell Road Bridge - BR-2017-014H - County of Peoria
Infrastructure, Renovation
Design
$2,943,132 CJ est. value
Peoria, IL 61607

Bituminous Surface Treatment
Infrastructure
Bidding
$500,000 CJ est. value
Glasford, IL 61533

Bituminous Surface Treatment
Infrastructure
Bidding
$500,000 CJ est. value
Glasford, IL 61533

Street Maintenance-Sealcoating and Fog Coating
Infrastructure
Post-Bid
Elmwood, IL

Sealcoating
Infrastructure
Post-Bid
IL

Construction of Rock Island Trail Extension
Results
Peoria, IL 61603

Partial Roadway Replacement - Peoria Stadium
Infrastructure
Results
Peoria, IL 61614

Lower Veteran's Park - Pickleball Courts
Infrastructure
Construction
$418,570 CJ est. value
Peoria, IL 61602

Lower Veteran's Park - Pickleball Courts
Infrastructure
Construction
$418,570 CJ est. value
Peoria, IL 61602

County Road 201 Remodel and Technology Upgrade - CH-19-003 - County of Peoria
Infrastructure
Conception
$350,000 CJ est. value
Peoria, IL 61603

Sealcoating
Infrastructure
Post-Bid
Laura, IL

General Wayne A. Downing Peoria International Airport
Renovation, Infrastructure
Results
Peoria, IL

Last Updated 05/10/2023 11:31 AM
Project Title

Folepi Lot Mill and Overlay

Physical Address View project details and contacts
City, State (County) Peoria, IL 61602   (Peoria County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $327,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 17,2022, project was awarded to Tazewell County Asphalt Co Inc. but awarded amount is not available.** Bids will be held good and may not be withdrawn for a period of 60 calendar days from the due date. Every bid shall consist of two (2) completed copies of Bid Failure of bidder to submit bid bond, certified check or cashier's check in amount to cover proposals bid upon is cause for rejection of this bid. Commencement of the work on the project may begin as early as August 17th, 2022. The project shall be substantially completed within 21 calendar days from preconstruction meeting or September 30th, 2022 whichever occurs sooner. Owner reserves the right to waive any irregularities and to accept any or reject all bids when in the opinion of Owner, such action will serve the best interest of Owner. Bids on all work of this contract shall be subject to the provisions of the "Illinois Prevailing Wage Act" (820 ILCS 130/1, et seq.). Contract Documents, including Drawings and Technical Specifications, are on file for review and bidding at the following locations: 1. Request access to an electronic copy of the FOLEPI Lot Mill and Overlay bid documents from George Sarraf at gsarraf@mweainc.com. 2. Office of the Engineer, Midwest Engineering Associates, Inc., 140 E. Washington Street; East Peoria, Illinois 61611.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents