Similar Projects
Repair/Maintain Airfield Stormwater System Phs II, FGWB 04-0014P2A and FGWB 04-0014P2B
Design
$5,000,000 to $10,000,000 est. value
Marietta, GA

Stormwater Detention Ponds Remediation
Infrastructure
Bidding
Grovetown, GA

Improvements to Existing Stromwater System - Kimball Street
Infrastructure
Bidding
Winder, GA

Road and Stormwater Maintenance and Repair Services
Term Contract
Post-Bid
Dunwoody, GA 30338

CDBG - Kennesaw Heights Subdivision
Post-Bid
Kennesaw, GA 30144

Water, Waste Water, and Storm Water Run-Off Usage at The Gillem Enclave
Results
Forest Park, GA 30297

Stormwater Pipe Repair Using Chemical Liners (Multiyear Contract)
Results
GA

On Call Professional Services - Storm Pipe Lining Services
Infrastructure
Bidding
Johns Creek, GA

Right of Way Improvements
Post-Bid
Thomaston, GA 30286

On-Call Storm Pipe Cleaning
Term Contract
Results
Less than $75,000 est. value
Alpharetta, GA 30009

Kimball Street Stormwater Improvements
Infrastructure
Bidding
Winder, GA

Dewater Quarry
Post-Bid
Auburn, GA 30011

MS4 Stormwater Inventory Inspections
Term Contract
Results
Alpharetta, GA 30009

Emerald Drive Storm Sewer Rehabilitation
Infrastructure
Bidding
Walnut Grove, GA 30052

Construct and Repair Outfall 9 Culvert at Poorhouse Creek and Windy Hill Road
Post-Bid
Marietta, GA 30069

Last Updated 08/20/2021 11:12 AM
Project Title

William Street Storm Drainage Improvements Project

Physical Address View project details and contacts
City, State (County) Dacula, GA 30211   (Gwinnett County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work will include demolishing existing storm drainage pipe and structures within drainage easements and right-of-way of William Street adjacent to #736, #746, and #750 William Street. This will include saw cutting William Street in two locations to remove cross drain pipes. Landscaping, trees, shrubs, driveways, and aprons will be demolished and replaced only as illustrated on the Drawings.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions.
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents