Similar Projects
Insulation Installation and Repair
Term Contract
Bidding
Raleigh, NC 27610

General Construction (FAL)
Term Contract
Bidding
Raleigh, NC 27610

Piedmont Triad Airport Residential Sound Insulation, Phase 7
Post-Bid
Greensboro, NC 27400

Cordelia Camp Backfill - Admissions to HFR 1st Floor Upfit - Paneling and Ceilings
Post-Bid
Cullowhee, NC 28723

Office Partition Installation
Results
Sneads Ferry, NC 28460

Window and Wall Repairs
Results
Less than $287,000 est. value
Elizabeth City, NC

Samarcand Training Academy - Phase 2 - Tufts Building
Construction
Eagle Springs, NC 27242

6924565 Repair Shower Pans, Ceiling, & Wall Leaks in Various Bldgs
Bidding
$250,000 to $500,000 est. value
Cherry Point, NC

North Carolina State Capitol Building Improvements
Post-Bid
Raleigh, NC

Courthouse Sheetrock Replacement and Repairs
Results
Beaufort, NC

1108 & S90 Interior Repairs
Bidding
$100,000 to $250,000 est. value
Camp Lejeune, NC 28547

City Hall Garage Ceiling
Post-Bid
Asheville, NC

Weaver Court 5 Dwelling Unit Cleanup
Results
Lumberton, NC

Paint Flooring Various Bldgs Rr2, As502, Tc701, Rr280, G640 And Rr6 Window, Gypsum, Duct Repair
Bidding
Camp Lejeune, NC 28547

Cafeteria Dining Room Design/Decor
Post-Bid
Lexington, NC

Last Updated 02/01/2019 02:39 PM
Project Title

Z--Repair Building 3A Water Damage Charles George VA Medical Center Asheville NC * Sources Sought Notice *

Physical Address View project details and contacts
City, State (County) Asheville, NC 28805   (Buncombe County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Contractor will provide all transportation, material hardware and parts, tools, specialized equipment, labor, supervision and technical expertise to repair building 3-A, Asheville, NC. Work shall include: - Demolish and remove cabinets from the kitchen and kitchen sink area. - Remove drop ceiling grid and ceiling tiles in the kitchen. - Demolish plaster walls and ceilings in the kitchen area. - Demolish plaster walls in the living room and dining room (excludes ceilings). - Remove asbestos containing mastic on wooden subfloors in the kitchen, sink area, and dining room. - Remove carpet from lower and upper level, steps, and the Florida room. - Remove plaster ceilings from the basement area. - Wet scrape the lead-based paint from the basement walls.
Details
Division 02 - Existing Conditions, Asbestos Remediation.
Division 09 - Finishes, Ceilings, Carpeting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents