Similar Projects
Kwik Trip - Dodd Avenue / Saint Peter
Demolition, New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Saint Peter, MN 56082

Kwik Trip - Dodd Avenue / Saint Peter
Demolition, New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Saint Peter, MN 56082

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

CSAH 13 Concrete Overlay
Results
Saint Peter, MN

Grading and Riprap
Infrastructure
Results

North 3rd Street Sports and Recreation Field House
New Construction, Infrastructure - 4,800 SF
Pending Verification
$1,100,000 CJ est. value
Saint Peter, MN 56082

North 3rd Street Sports and Recreation Field House
New Construction, Infrastructure - 4,800 SF
Pending Verification
$1,100,000 CJ est. value
Saint Peter, MN 56082

Caswell Park Phase #2 Fieldhouse Construction - City of North Mankato
Infrastructure
Conception
$17,000,000 CJ est. value
North Mankato, MN 56003

Rental Equipment: Road Construction and Maintenance
Term Contract
Post-Bid
$1,500,000 to $2,000,000 est. value

Grading, Bituminous Surfacing
Infrastructure
Results
MN

Hoover Drive SRTS - City of North Mankato
Infrastructure
Conception
$520,000 CJ est. value
North Mankato, MN 56003

North Mankato Indoor Recreation Center
Addition, Demolition, Infrastructure, Renovation - 30,000 SF
Post-Bid
$7,000,000 CJ est. value
North Mankato, MN 56003

Concrete and Bituminous Surfacing, Lighting; Ada Improvements, Snow Fence, Roundabouts, Traffic Managment System , Noisewalls, and Bridges
Infrastructure
Results
MN

Sherman Street (700 Block - Monroe to Garfield) - City of North Mankato
Infrastructure
Conception
$800,000 CJ est. value
North Mankato, MN 56003

Last Updated 01/12/2023 03:33 AM
Project Title

Belgrade Avenue Improvements (Three-lane and Interchange) - City of North Mankato

Physical Address View project details and contacts
City, State (County) North Mankato, MN 56003   (Nicollet County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2025
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined The project is included in the City of North Mankato 2023-2027 Capital Improvement Plan (CIP). As of January 12, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents