Similar Projects
MIA - RCF D60 Gate New Swing Doors
Post-Bid
Miami, FL

Elderly Housing Buildings Impact Windows and Glass Doors
Results
Less than $350,000 est. value
Hialeah, FL 33010

Pahokee Fleet Maintainance Building Replacement of Sliding Doors
Post-Bid
Miami, FL 33476

East Tower Door Replacements
Results
Less than $120,000 est. value
FL

TGK Security Storefornt Door Replacement
Results
Less than $400,000 est. value
FL

Lower Concourse E-FIS 1st and 3rd Floor Door Replacement
Post-Bid
FL

West Wing Doors Replacement
Results
Miami, FL 33136

Replacement of Windows at the Bridge Tender Houses on the Venetian Causeway
Results
Less than $70,200 est. value
FL

Replacement Doors and Windows Contracting
Post-Bid
Opa-locka, FL 33054

Protection Covering and Hurricane Shutters
Term Contract
Results
Miami, FL 33128

30 West 33rd Street and 35 West 32nd Street - Exterior Doors Replacement
Results
Hialeah, FL 33012

Procurement Window Replacement
Results
Homestead, FL 33030

West Doors Refurbishments
Results
Less than $60,000 est. value
Miami, FL

Overhead Doors, Security Gates, and Automatic Doors
Term Contract
Results
FL

6050-1/24, Roll-Up Doors, Group 2: Repair, Furnish and Installation Services
Post-Bid
Miami, FL

Last Updated 07/15/2019 01:59 PM
Project Title

Rolling Bay Doors at Coast Guard Base Miami Beach

Physical Address View project details and contacts
City, State (County) Miami, FL 33139   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $27,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description United States Coast Guard Base Miami Beach is accepting proposals for qualified individuals or firms to replace two roll up service doors in Bldg. 9 at Base Miami Beach. Prior to submitting a quote, it is mandatory to examine the scope of work and it is highly recommended to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held prior to starting the work at Coast Guard Base Miami Beach
Details
Division 08 - Openings, Doors and Frames.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents