Similar Projects
Fire Alarm Replacement & Installation Services
Bidding
Deerfield, NH

Airline Terminal Fire Alarm System Upgrade at Manchester-Boston Regional Airport
Post-Bid
$1,500,000 to $2,200,000 est. value
Manchester, NH 03103

Complete Replacement of Fire Alarm System
Post-Bid
$4,000,000 to $6,000,000 est. value
Concord, NH

Fire Sprinkler Systems Testing and Inspection
Results
Brentwood, NH

Fire Inspection Services
Results
Dover, NH

Sprinkler Upgrade
Post-Bid
Tilton, NH 03276

Child Care Center Fire Sprinkler Upgrades
Results
Rochester, NH

Bureau of Bridge Maintenance
Post-Bid
Conway, NH 03813

Fire Extinguisher inspections
Term Contract
Results
Merrimack, NH 03054

Federal Building and Courthouse Fire Alarm Replacement Design/Build
Post-Bid
$1,000,000 to $4,500,000 est. value
Concord, NH 03303

Fire Alarm System Inspection and Testing
Term Contract
Results
Merrimack, NH 03054

Sprinkler Inspections
Term Contract
Results
Merrimack, NH

Fire Alarm and Fire Suppression Systems Services
Term Contract
Results
Farmington, NH 03835

Replacement of Raymond High School Fire Pump the Raymond High School
Results
Raymond, NH 03077

Fire Alarm Testing and Maintenance Services
Term Contract
Results
Bedford, NH

Reported 11/22/2019 12:00 AM
Project Title

Fire Alarm System Upgrade at Derry Wastewater Treatment Plant

Physical Address View project details and contacts
City, State (County) Derry, NH   (Rockingham County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Replace existing 4-zone and existing 8-zone fire alarm panels with new addressable fire alarm panel with battery backup for 60 hours. 2. Supply and install one (1) new junction box in existing WWTP building and one (1) new junction box in the new WWTP Garage building. 3. Replace twenty-four (24) existing heat detectors with new addressable heat detectors. 4. Supply and Install four (4) new addressable heat detectors in new WWTP garage building 1. 5. Replace five (5) existing smoke detectors with new addressable smoke detectors. 6. Replace seven (7) existing pull stations with new addressable manual pull stations. 7. Supply and install two (2) new addressable manual pull stations in new WWTP garage building 1. 8. Replace five (5) existing horns/strobe lights 9. Supply and install two (2) new horns/strobe lights in new WWTP garage building 1.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents