Similar Projects
Annual Contract for Plumbing/Mechanical Work
Term Contract
Post-Bid
Salt Lake City, UT 84115

Annual Contract for General Plumbing Fittings and Supplies
Term Contract
Post-Bid
Salt Lake City, UT 84115

Weatherization Program
Results
Price, UT

Housing Maintenance Services
Term Contract
Results
Fort Duchesne, UT 84026

Jordan Hills Reservoir Pipe Replacement Project
Post-Bid
West Jordan, UT 84088

Plumbing
Results
Logan, UT 84322

Shower/Kitchen/Bathroom Remodel Plumbing
Post-Bid
UT

SLCC Water Fountain Elkay Bottle Filling Station
Results
$50,000 to $60,000 est. value
Salt Lake City, UT 84130

U Hospital Mediserve Renovo Dock Remodel - Plumbing
Post-Bid
$1 to $737,500 est. value
Salt Lake City, UT 84113

School of Medicine 5 West Patient Safety Upgrade - Plumbing
Results
$40,000 est. value
Salt Lake City, UT 84132

School of Medicine 5 West Patient Safety Upgrade - HVAC/Plumbing
Results
Less than $200,000 est. value
Salt Lake City, UT 84112

Plumbing Services
Term Contract
Results
Salt Lake City, UT 84111

DFCM Construction - General Contractors - Grassy Mountain Restarea Plumbing
Results
$160,000 est. value
Grantsville, UT 84029

T and S Plumbing and Delta Plumbing Items-Contract
Term Contract
Results
Clearfield, UT 84016

East/West HPER Systems Upgrade
Results
Less than $80,000 est. value
Salt Lake City, UT 84112

Last Updated 01/09/2020 01:51 PM
Project Title

Plumbing/Venting Updates Station 113

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84119   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Dryer Vent Add: 1. Provide and install (2) Inline fans w/integral controls 2. Provide and install (2) Secondary lint traps 3. Provide and install (2) 4" runs with misc. fittings. Venting will run from dryer location at back of bay, up to and along the bay ceiling and out the wall at the front of the bay. Approximately 70' of pipe per run. 4. Provide and install (2) wall terminations with backdraft dampers 5. Provide core cut for (2) 4" holes through 12" concrete walls 6. Provide new electrical breaker, disconnect and wire run for fans. Existing electrical panel is next to the water heater in the attached drawing 7. Provide misc. hangers for pipe 8. Perform check, test and start on new equipment. Water Heater Replacement/Soft Water System/Plumbing Update: 1. Provide and install (1) 50 gallon electric water heater 2. Provide and install (1) 48K grain water softener with brine take, next to water heater on mezzanine. Soft water to be connected to hot water system. 3. Provide and install (1) drain pan for water heater, softener and brine tank. Include hard drain line for proper drainage. 4. Relocate water heater from existing location to mezzanine. Water lines and electrical panel within 10' of new location. Water heater to be moved up about 8' to mezzanine, and 3' to the side of existing location with open walls and exposed plumbing. Relocate drain, electrical, and supply lines as necessary to accommodate move. 5. Replace main (exposed) cast iron drain line with PVCDWV (approx. 30'). There will be a few fittings and connections required. 6. Provide additional support as needed for new plumbing Perform check, test and start on new equipment

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents