Similar Projects
Prime Express - Convenience Store
New Construction - 5,000 SF
Conception
Concord, NC 28027

Fleet Services Facility - City of Concord
New Construction
Conception
$10,886,871 est. value
Concord, NC

Davidson Highway Industrial
New Construction, Infrastructure - 139,800 SF
Design
$75,000,000 CJ est. value
Concord, NC 28027

Red Bull Manufacturing and Distribution Center
New Construction, Infrastructure - 1,400,000 SF
Design
$740,000,000 CJ est. value
Concord, NC 28027

Rob Wallace Park Phase 2B Improvements
Infrastructure
Bidding
$1,200,000 CJ est. value
Midland, NC 28107

Intersection and Signal Improvements at I-85 and Kannapolis Parkway
Infrastructure
Bidding
$2,000,000 CJ est. value
Concord, NC 28025

Substation T
Infrastructure
Post-Bid
Concord, NC

Express Oil Change
New Construction - 9,394 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Harrisburg, NC 28075

Parking Lots and Roadway Improvements
Infrastructure
Results
$1,138,757 CJ est. value
Mount Pleasant, NC 28124

David Phillips Community Center Terraced Garden
Infrastructure
Results
$728,839 CJ est. value
Concord, NC 28025

QuikTrip #1012
Renovation - 4,993 SF
Construction
Concord, NC 28027

R. Brown McAllister Elementary School - Early Release Packages
New Construction, Infrastructure - 116,000 SF
Construction
$37,000,000 CJ est. value
Concord, NC 28025

Lakeshore Corporate Park
New Construction, Infrastructure - 660,000 SF
Pending Verification
$49,000,000 CJ est. value
Kannapolis, NC 28082

Bakers Creek Park
New Construction, Infrastructure
Pending Verification
$141,000,000 CJ est. value
Kannapolis, NC 28081

Airport Helipads - City of Concord
New Construction, Infrastructure
Conception
$410,000 est. value
Concord, NC 28027

Last Updated 05/01/2023 10:36 AM
Project Title

Fleet Services Facility - City of Concord

Physical Address View project details and contacts
City, State (County) Concord, NC 28025   (Cabarrus County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $10,886,871 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of replacing the existing Fleet Facility with a larger facility built on part of the 33 acre expansion area at the Alfred M. Brown Operations Center (BOC). Identified as a priority in the BOC Space Needs Study, the larger facility will be sufficient for future growth and large enough to service fire apparatus. This project also includes a fuel facility (gas and diesel), relocating the current Solid Waste debris site to a cleared area between the new fleet facility and the Traffic Management Center, and constructing the appropriate access road to the debris site to handle the heavy duty vehicular traffic. As of July 16, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents