Similar Projects
Sconticut Neck Road Subdivision
New Construction
Conception
Fairhaven, MA

Residences At The Assonet Inn
New Construction
Conception
Freetown, MA

Multi-Family and Single Family Homes
New Construction - 36,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Fall River, MA 02721

Bartlett Estates
New Construction
Design
New Bedford, MA 02745

2020 On-Call Trades Contract
Post-Bid
Less than $25,000 est. value
Fall River, MA

Disposition of Municipal Property for the Development of Affordable Housing
Results
Westport, MA

478-480 Union Street Homeownership Development
Results
New Bedford, MA

Fuller Estates
New Construction
Construction
Taunton, MA 02780

Fisher Estates
New Construction
Construction
Somerset, MA 02726

Bella Rose Estates
New Construction
Pending Verification
Taunton, MA 02780

Farland Estates
New Construction
Pending Verification
New Bedford, MA

Pike Estates
New Construction
Conception
Attleboro, MA 02703

Friend Street Subdivision
New Construction
Design
Freetown, MA 02702

HILAPP Phase II - Roofing, Siding, Windows, Door and Porch Trim Replacement - General Bid
Results
Less than $3,489,000 est. value
New Bedford, MA 02740

Greystone Estates
New Construction
Construction
Raynham, MA

Last Updated 02/25/2021 02:45 PM
Project Title

Bathroom Repairs and Site Re-Grading

Physical Address View project details and contacts
City, State (County) Swansea, MA 02777   (Bristol County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $53,800
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of: 1. Removing existing and installing new cabinets,sinks,countertops,tile flooring, tile walls, and tile wainscoting at one bathroom. 2. Removing existing tile, sheetrock and cement boards back to wall wood studs for replacement with new. Removing tile flooring and substrates for replacement with new. 3. Removing existing and installing new electrical lighting and vent fans as shown on the drawings. 4. Removing existing and installing new plumbing. 5. Removing existing three(3) select exterior walls and wall assembly components and replacing with new wall assembly with similar components. 6. Removing and salvaging two (2) existing windows as part of wall removal and reinstalling in new wall. 7. Partial exterior regrading of site around perimeter of existing building to create drainage away from building. 8. Resetting selective existing fencing and landscaping.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents