Similar Projects
Komarek School New Gymnasium Construction
New Construction
Conception
North Riverside, IL

Northeast Elementary Magnet School Expansion
Addition
Conception
Danville, IL 61832

Grade School Renovations
Renovation, Addition - 7,000 SF
Design
$3,500,000 est. value
Orion, IL 61273

Existing Building Classroom Addition
Addition
Design
Highland, IL

Early Childhood Center
Renovation, Addition
Post-Bid
Villa Park, IL 60181

New Early Childhood Center Bid Release 3
Renovation, Addition - 100,400 SF
Post-Bid
Lombard, Villa Park, IL 60181

Burley ES - LBP Mitigation and ACM Patch & Repair in the Ventilation System
Term Contract, Infrastructure
Results
$29,725 CJ est. value
Chicago, IL 60657

2021 District Renovations
Renovation
Results
$128,408 est. value
Bloomington, IL 61701

Holy Family Parish Building
Addition - 14,005 SF
Construction
Shorewood, IL 60404

Montessori School
Build-Out - 18,000 SF
Construction
Naperville, IL 60540

Marantha Christian Academy
Build-Out - 28,000 SF
Conception
Mattoon, IL 61938

2021 Capital Improvements at Liberty ES BP #6 & #31
Renovation
Post-Bid
Cicero, IL 60804

Three Oaks Elementary School Improvements
Renovation, Addition
Results
Cary, IL 60013

Worth Elementary
Renovation, Addition
Construction
Worth, IL 60482

New Elementary School – Bid Release 3
New Construction - 86,260 SF
Post-Bid
Hampshire, IL

Last Updated 10/26/2022 01:03 PM
Project Title

2022 Toilet Renovations at: Goodings Grove School Rebid

Physical Address View project details and contacts
City, State (County) Homer Glen, IL 60491   (Will County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $125,970 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Anticipated Award of Contract date: October 25, 2022 Anticipated Start of Construction: October 26, 2022 Anticipated Substantial Completion date: January 8, 2023 Lump sum bid proposals will be received for this project at the scheduled time of receipt bids and will be publicly opened at that time. Bid security in the form of a bid bond, certified check or cash in an amount equal to 10 percent of the base bid amount shall be submitted with the bid. Should a bid bond be submitted, the bid bond shall be payable to the Board of Education, Homer Community Consolidated School District 33c The District reserves the right to reject any or all bids or parts thereof, or waive any irregularities or informalities, and to make the award in the best interest of the District. All bidders must comply with applicable Illinois Law requiring the payment of prevailing wages by all Contractors working on public works. Bidder must comply with the Illinois Statutory requirements regarding labor, including Equal Employment Opportunity Laws. Final completion date January 13,2023 Approximate range of construction cost $50,000 to $75,000

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents