Similar Projects
Last Updated | 08/29/2022 11:02 AM |
Project Title | Combined Support Maintenance Shop 7 Upgrade Water Service at CSMS 7 Main Shop |
Physical Address | View project details and contacts |
City, State (County) | Longmont, CO 80501 (Boulder County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $188,610 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Install New Water Line AFB DBB Date Email Questions Due July 22, 2022 by 10:00AM Date Email Answers Issued July 26, 2022 by 4:00PM Project Description The Colorado Army National Guard (COARNG) is requesting bids to install a new waterline at the CSMS7 Facility at 4045 Weld County Road 22, Longmont, CO. This project involves the installation of approximately 270 lineal feet of new 2" water line piping. The new waterline will run from a predesignated water tap pit location to the northeast corner of building 330. Some branch piping will be required to service future connections to buildings 331 and 334. The new waterline will stub up through the interior concrete slab in the northeast corner of building 330. The site work includes utility location, saw cutting, trenching, excavating, concrete replacement and asphalt patching. The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on ColoradoVSS website. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time. Point of Contact/Clarification DMVA Bidding/State Contracting: Dana Stansbury 720-250-1542 dana.stansbury@dmva.state.co.us DMVA Project Manager: Alex Knox 720-471-1613 alex.j.knox.nfg@army.mil DMVA Project Manager: Domenick Scarimbolo 720-250-1372 domenick.j.scarimbolo.nfg@army.mil Construction Schedule: 270 calendar days from Notice to Proceed to Substantial Completion 30 calendar days for completion of punch list items, warranties, etc |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |