Similar Projects
Saint Timothy Catholic School Gym and Classroom Addition - Phase 3
New Construction, Addition - 32,349 SF
Conception
Union, KY 41091

Career Technology Center Renovation
Renovation
Design
Bardstown, KY

Bardstown HIgh School Renovation
Renovation
Design
Bardstown, KY

Mason County High School - Athletic Turf Replacement
Renovation, Alteration
Bidding
Maysville, KY 41056

Shelby Valley High School - Synthetic Turf Field Replacement
Renovation, Infrastructure
Bidding
Pikeville, KY 41501

Corbin Middle School Concessions / Restrooms
Post-Bid
$215,000 est. value
Corbin, KY 40701

Corbin High School Career Center - Phase 1
Post-Bid
Less than $2,500,000 est. value
Corbin, KY 40701

Central Hardin High School - Bid Group 1
Renovation, Addition
Results
Cecilia, KY 42724

Harrison County Middle School Football Field Improvements
Results
Cynthiana, KY 41031

Boone County High School Addition and Renovations
Renovation, Addition - 18,573 SF
Construction
Less than $8,379,900 est. value
KY

Assumption High School Expansion
Addition - 35,000 SF
Construction
Louisville, KY 40205

School Buildings
New Construction
Pending Verification
$22,434,420 est. value
Bowling Green, KY 42104

New Pavilion - Hopkins County School
Addition - 960 SF
Pending Verification
$10,000 est. value
Madisonville, KY

Bardstown Middle School Renovations
Renovation
Design
Bardstown, KY

New Central Board Office
New Construction
Bidding
Frenchburg, KY

Last Updated 03/29/2022 11:42 AM
Project Title

SWHS Hitting Facility/Concession Building, Soccer Building and Scoreboard Stabilization

Physical Address View project details and contacts
City, State (County) Bowling Green, KY 42101   (Warren County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Warren County Board of Education will be received sealed bids for the bid packages listed for the South Warren High School Hitting Facility/Concession Building, Soccer Building & Scoreboard Stabilization: Bid Package 015 Site Excavation and Exterior Utilities Bid Package 030 General Trades and Concrete Bid Package 040 Masonry Bid Package 080 Steel Doors, Frames, Flush Wood Doors and Finish Hardware Bid Package 092 Gypsum Board Assemblies and Acoustical Ceiling Bid Package 096 Flooring Bid Package 099 Painting and Joint Sealants Bid Package 130 Pre-Engineered Metal Building System Bid Package 210 Fire Protection Bid Package 220 Plumbing and HVAC Bid Package 260 Electrical

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Lighting.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents