Similar Projects
WHRC-ITA Addition and Renovation BP 11
Renovation
Bidding
Pontiac, MI

New Middle School Bid Pack 2
New Construction
Post-Bid
West Bloomfield, MI

Royal Oak Oakland Elementary School Addition and Renovation
Renovation, Addition
Post-Bid
Royal Oak, MI 48067

Meadow Brook Renovations 2019
Results
Rochester, MI

University Hills Renovations 2019
Results
Rochester, MI

Waterford Montessori Academy, Elizabeth Lake Campus - Building Addition
Addition - 21,628 SF
Construction
Waterford Township, MI 48328

Schoolcraft Elementary Renovation and Addition
Renovation, Addition
Post-Bid
Waterford, MI 48329

2019 Sinking Fund Projects - Bid Package No. 1
Results
Lake Orion, MI

Clarkston 2016 Bond Projects - Bid Package 9
Post-Bid
Clarkston, MI

Van Hoosen Middle School Renovations 2020
Renovation
Results
Rochester, MI 48306

Holly Area Schools Davisburg and Rose Pioneer Elementary
Renovation, Addition
Post-Bid
Holly, MI

Reuther Middle School Renovations 2020
Renovation
Results
Rochester, MI 48307

2001 High School Renovations
Renovation
Post-Bid
Bloomfield, MI

Stoney Creek High School Renovations 2020
Renovation
Results
Rochester, MI

Orion Oaks Site and Building Improvements
Post-Bid
Lake Orion, MI 48360

Last Updated 06/16/2020 04:24 PM
Project Title

2019 Bond Projects – Bid Package 1

Physical Address View project details and contacts
City, State (County) Walled Lake, MI   (Oakland County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, exterior veneer work, architectural renovation work, electrical work, plumbing work, HVAC work, and site work at Commerce Elementary, Glengary Elementary, Walled Lake Elementary, Wixom Elementary. In addition there will be electrical and HVAC work at Geisler Middle School and ESC, as well as roofing and clerestory glazing at the Media Centers of Loon Lake Elementary, Keith Elementary, and Guest Elementary all within the Walled Lake Consolidated School District.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents