Similar Projects
Sea Isle City Public Fishing Pier
Post-Bid
Sea Isle City, NJ 08243

Overpeck Floating Dock
Post-Bid
Hackensack, NJ 07601

Installation and Removal of Docks at the Mercer County Arm and Hammer Park at Waterfront Park
Term Contract
Results
Trenton, NJ

Boat Dock and Ramp Replacement
Results
Less than $150,000 est. value
Jersey City, NJ 07305

Wood Pilings for 24 Months
Term Contract
Post-Bid
Wildwood, NJ 08260

Schellengers Landing Safety Improvements and Identification Program Design Plans
Results
$1,240,725 est. value
Cape May, NJ 08204

Paulsboro Marine Terminal Rail Link
Renovation
Post-Bid
Paulsboro, NJ 08066

Furnishing and Delivery of One Unit of 72 Feet Modular Concrete Floating Dock with Accessories
Results
$52,500 est. value
Lincroft, NJ 07738

Dock Replacement, Liberty State Park
Post-Bid
Less than $915,425 est. value
Jersey City, NJ 07305

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Reconstruction of Various Bulkhead
Post-Bid
Avalon, NJ 08202

Beach Access Decks and Stair Piling Installation
Results
$8,400 est. value
Lower Township, NJ

Proposed Steel Sheet Pile Bulkhead at Donnalisa Drive
Post-Bid
Oakhurst, NJ 07755

Construction of Ventnor Fishing Pier Bathrooms
Results
Ventnor City, NJ

Boat for Marine Field Station
Post-Bid
Galloway, NJ

Last Updated 02/09/2021 01:54 PM
Project Title

Horseshoe Lake Dock Replacement

Physical Address View project details and contacts
City, State (County) Ledgewood, NJ   (Morris County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is for the removal of the existing fixed dock and the supporting concrete. The new construction will include the installation of sheet piling and pilings to support the new structure as outlined in the bid package. The successful bidder will be responsible the demolition and proper disposal of all materials and the construction of a new dock as described in the bid specifications.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents